Loading...
Lesley Retail (QT)-CS110912 ; ‚ ‚ ! GLENN ENGINEERING Engineering __ 1. When is Dividend being built? With the QuikTrip Development to our 1 eastern property. 2. Who is others? The developer. 3. You will need a fire meter and vault. Added. 4. Double check the location of the proposed Sanitary Sewer The proposed connection is proposed to connection. be at a new SSMH being built by the developer. 5. There will be more comments during the detailed engineering Acknowledged _ plan review. 6. Glenn Engineering owes us as- builts on several projects. We We have contacted Scott and will will not release any permits or approve any plans until we receive them. provide the As- Builts. Fire Administration 1. If building is Type V construction, it will be required to be equipped with an automatic fire sprinkler system due to Added. greater than 5,000 SF (counting front/rear canopies) 2. Fire lane is inadequate. It is not accessible due to no median Fire lane revised per conversation with openings. Tim Oates. 3. Entire drive opening is to be platted as fire lane per ordinance. Fire lane is modified to be full width of drive at approaches. 4. Two fire hydrants are required to serve this building. Done. Add /Relocate fire hydrants to fire lane drive openings. Planning Department 1. Remove the water and sewer utility lines from Site Plan; however, existing and proposed fire hydrants should be Done. shown. 2. Only 25 parking spaces are required, and per the HC District regulations, no more than 50% of the required parking can be located in the front yard; therefore technically, only 12 spaces Listed as a PD Condition. can be located in the front yard. List as a requested PD condition in the PD Conditions Table. 3. The mutual access drives should extend to the property to the Access drive extended. Sidewalks north and be labeled as such. Include a sidewalk along each added. street with a walkway to tie into this development.