ST8504-CS 880203The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214 - 462 - 0022
February 3, 1988
Terra Companies
5944 Luther Lane
Suite 502
Dallas, Texas 75225
RE: Inspection Fee- Riverchase Drive Phase I
Mr. Harrell:
Based upon construction cost submitted by Nathan D. Maier
Consulting Engineers. The inspection fee is $8,297.34
($553,156.60 X 1.5%). This is due upon receipt of this letter.
Thank you,
Steven M. Morton
Development Inspections
SMM/sm
TERRA CORPORATE JOINT VENTURE ,:O_. 8 3
TWO LINCOLN CENTRE (214) 934-0444
5420 LBJ FREEWAY, SUITE 1370
DALLAS, TX 75240 ~
3-8 19 88
PAY TO THE ~
ORDEROF City of Coppell. ". ,, ' ~-~/'~--23"---40---9-~'-O-'~-
Twenty Three Thousand & Four' Hundred andre /~ 09/~0 --~--~D~ OLLARS
~ /-~...._..~.~ ~ __V~ .....
,,.oooaa~,,..:~o?~o~,: ~~.;,o?~.;.~,~ -' %~ '-
Insp. Fee-MacArthuz
Insp. Fee-Riverchase8,29'7~.3