Loading...
2000_0221 WATER Issued: Finished 07/' er' Employee: In el 'od Grid map: Name: Address: (I hiea do) Viet.} Phone Number: (ICI) (WK): Check for: Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. Backflow Insp. 2. Repair 3. Maintenance 4. Other Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. E. Barricades B. Cones C. Tape D. Lights EE. Other Request for Services: meTe1Z ci l aJU Qe_ c 1.11 7. If Meter /Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: /•7 5 s 2 Unit # Miles Hrs Equipment A. Old Meter 4...45/6M Readinga / 3 /1 S 8'6o)70 B. New Meter # 3-69111 Reading C. Old Meter Size/Type: b e - D New Meter SizeType "45-1 e< VP E. Type of work performed or endings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man- hours: /2- H J Crew Members. / 11. List Materials Used: 12. If you had an accidenulncident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: or fail 14. How many trips to do task? �j� Signature / C/