Loading...
2000_0221 WATER Issued: Finished: ?N Employee: /11 Grid map: Name: Address:5 ,5 3 a. ce&vo Phone Number: (KM) (WK): Check for. Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. Backflow Insp. 2. Jteoair 3. Maintenance 4. Qtha Backflow Insp. A. Main Line A. Pump • A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: /e lLe YL J c rt/t12 Q eL & 7. If MeteriService Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment used 8. If Meter Change Out: Unit # Miles Hrs Equipment A. Old Meter /4/ Reading 1 C O. 1 / 5 i (TO B. New Meter # 6 L/ 30 t7 Reading C. Old Meter Size/Type: f,e e j SI n Yv 5 7 D New Meter Size/Type /'j/15/ s/g E. Type of work performed or findings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man - hours: /. Crew Members. 11. List Materials Used: 12. [f you had an accident ncident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: ass or fail 14. How many trips to do task? Signature ) /C(