Loading...
2000_0216 WATER Issued: Finished: Employee:,' 2 / ;» Grid map: Name: Address: ..,(1)) Phone Number: (HM) (WK): Check for: Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. Backflow [nip. 2. Repair 3. Maintenance 4. Other Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: le-/Q, C L, (,. 7. If Meter /Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - VehiclefEquipment used 8. If Meter Change Out: unit # Miles Hrs Equipment 1 f755� (2d Reading 4 S /� r c 6; 61(16 A. Old Meter , � u ; B. New Meter # 2 li 5/1 2_ Reading CD C. Old Meter Size/ Type: D New Meter Size/Type E. Type of work performed or findings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man- hours: lL Crew Members. 11. List Materials Used: 12. If you had an 2::_identIncident while performing this request. Did you report it? Yes or no 13. Water Utilities rr.eter inspection: pass or fail 14. How many trips to do task? Signature c t)' ° -. //I)