Loading...
2000_0218 WATER Issued: Finished: Employee: ' /5 C e Grid f map: Name: Address: 75 G ill e M (4c, ,-' ' L? (3. Phone Number: (I-0.1) (WK): Check for: Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. Backflow Insp. 2. Repair 3. Maintenance 4. Other Backflow Insp. A. Main Line A. Pump " A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re - Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: /o5 - -/ - (? 01 7 04E%i' C') 7. If Meter /Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: Unit # Miles Hrs Equipment A. Old Meter # g3 5 it—.. Reading /1 7 � YC` B. New Meter #, t y 14 ,'9— Reading C. Old Meter Size/Type: 5" f> a +',' D New Meter SizeiType5/ ' )1// f` ►� E. Type of work performed or fmdizs: 9. If mainline or deep service repair, describe type of pipe or service line and condition 10. Man- hours: )',Z Nom Crew Members. r 11. List Materials Used: 12. If you had an a: identIncident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many trips to do task? Signature ' `