2002_0806 WATER
Issued: g/6 / 0 a Finished: Employee: (.1 1 It ' Grid map:
Name: Address: l ' � — 4 1 GV 2\ I
Phone Number: (HM) (WK):
Check for: Accuracy test: Meter Leak: Check water pressure:
Initial meter relocation inspec ions Re -read
1. Backflow Insp. 2. Repair 3. Maintenance 4. Other
Backflow Insp. A. Main Line A. Pump A. Line Locate
Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate
Re -Cert. Date C. Service Line C. Samples C. Tap
D. Hydrants D. Equpment D Excavation
E. Safety
5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other
6. List of safety equipment at site if applicable:
A. Barricades B. Cones C. Tape D. Lights E. Other
Request for Services:
i
7. If Meter /Service Leak: Classify: - City: Customer
A. Water Loss (estimate): GPM Fire plug flushing Total Gallons
B. Was Water Metered: Yes No
C. Was Customer Notified: Verbally Doorknocker -
Vehicle/Equipment Used
- Of Meter Change Out: Unit # Miles Hrs Equipment
A. Old Meter # g*3D9$g3 Reading aa6(oq
B. New Meter r 3151 al 'f- Reading 19"
C. Old Meter Size :Type: (S ct d ,, - S/$ D New Meter Size/Type Ma s' r 5 /fl
E. Type of work performed or flings:
9. If mainline or deep service repair, describe type of pipe or service line and condition:
10. Man-hours: Crew Members.
11. List Materials Used:
12. If you had an acciden_ incident while performing this request. Did you report it? Yes or no
13. Water Utilities meter inspection: pass or fail
14. How many nips to do task?
Signature / C/ /
•