Loading...
PA0101-LR010424REPORT OF REINFORCING STEEL OBSERVATION I--BC ENGINEERING, INC. 8901 Carpenter Frwy., Suite #10~ Dallas, Texas 75247 Date of Service: 04/24/01 Report No.: 94011093.0007 Client No.: COPPEL Project No.: 94011093 Client: City of Coppell - Parks & Recreation Project: Andrew Brown Park East 732 DeForest Moore Road Coppell, TX 75019 Coppell, Texas Services: Observe placement of reinforcing for compliance with furnished dra~vings. PROJFCT DATA Drawings Utilized: Locations/Items Observed: Paving - see attached sketch Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Piecing Drawings Approved X Bar Length and Shape X ~olumn Tied Propedy Bar Size X Proper Bar Placernent X ties and Spaces Bar Grade X Propedy Tied X Stirrup Spacing/Type Rebar Clean X Dowel Bars in Place X We~ded Splices :cfm Clean X ~roper Bar Suppods X Mechanical Splices ~umbe, of Bars X _apped Splices X Proper Cover X Discrepancies/Comments: No discrepancies noted at the time of observation. Technician: T. Smith ~~1 ~~d I Reoort Distribution: ~~ I~ ~~~~ (1) City of Coppell - Parks & Recreation (I) TLB Construction ( 1 ) City of Coppell - Constr. lnsp. V~el~n~, P. ~E. ect Engineer 309sks This repeal is exclusively for the use of the client indicated above and shall not be reproduced without wdtten approval of HBC Engineering, Inc.