PA0101-LR010424REPORT OF REINFORCING STEEL OBSERVATION I--BC
ENGINEERING, INC.
8901 Carpenter Frwy., Suite #10~
Dallas, Texas 75247
Date of Service: 04/24/01 Report No.: 94011093.0007
Client No.: COPPEL Project No.: 94011093
Client: City of Coppell - Parks & Recreation Project: Andrew Brown Park East
732 DeForest Moore Road
Coppell, TX 75019 Coppell, Texas
Services: Observe placement of reinforcing for compliance with furnished dra~vings.
PROJFCT DATA
Drawings Utilized:
Locations/Items Observed: Paving - see attached sketch
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT
Piecing Drawings Approved X Bar Length and Shape X ~olumn Tied Propedy
Bar Size X Proper Bar Placernent X ties and Spaces
Bar Grade X Propedy Tied X Stirrup Spacing/Type
Rebar Clean X Dowel Bars in Place X We~ded Splices
:cfm Clean X ~roper Bar Suppods X Mechanical Splices
~umbe, of Bars X _apped Splices X Proper Cover X
Discrepancies/Comments: No discrepancies noted at the time of observation.
Technician: T. Smith ~~1 ~~d I
Reoort Distribution: ~~ I~ ~~~~
(1) City of Coppell - Parks & Recreation
(I) TLB Construction
( 1 ) City of Coppell - Constr. lnsp.
V~el~n~, P. ~E.
ect Engineer
309sks This repeal is exclusively for the use of the client indicated above and shall not be reproduced without wdtten approval of HBC Engineering, Inc.