Loading...
2002_0701 • WAFER Issued: 7 Finished: 7 -5 Employee: Ay1 e /'' d,7& Grid map: r\ Name: Address: 13S YYl P .. o•� I�u Phone Number. (HLM) (WK): Check for: Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. Backflow Insp. 2. R epair 3. Maintenance 4. Other Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: 7. If Meter /Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: Unit # Miles Hrs Equipment A. Old Meter # ?Ho 23 Ye) ) Reading / 74 B. New Meter # 315),,,.? ' Reading 5 C. Old Meter SizeiType: - iy s/ D New Meter Siz /Type / / / E. Type of work performed or findings: f e/4 -e ° a J ( /e h 'f Ida 9. If If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man- hours: Crew Members. 11. List Materials Used: 12. If you had an accidentlncident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many trips to do task? Signature