Loading...
2002_0701 • WAFER // • Issued: 7 --/ �D Z Finished: 7 - Z- Employee:��'// e, �l // b Grid map: Name: Address: / Z 3 M Xcai Phone Number (FLM) (WK): Check for: Accuracy test Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. $ackf1ow Insp. 2. Repair 3. Maintenance 4. Qtbi Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other • 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: 7. If Meter /Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: Unit # Miles Hrs Equipment A. Old Meter 7 � / / Cp Z.5 VVa/ Reading d c B. New Meter 4 '3/510?I' S F ending j! s C. Old Meter SizeiType: 4 f /1 D New Meter Sizetyype E. Type of work performed or findings: ,'Y /flCe 6 ,J Joe /1 /G' o 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man hours: Crew Members. 11. List Materials Used: /-toc / yeJ 4° /.lr „/i & 12. If you had an accidentlncident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many trips to do task? �r) Signature ' /WA')