Loading...
2002_0701 WATER r /,/ Issued: 7-1 _0 Z Finished 7 Employee: / i ,I "1 L O Grid map: Name: Address: f Z Z Y Phone Number: (HM) (WK): Check for: Accuracy test Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. $ackflow Insp. 2. Mak 3. Maintenance 4. Other Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other • 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: 7. If Meter /Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: q Unit # Miles Hrs Equipment A. Old Meter 7 9/' 6 2 Reading / r. P57 B. New Meter 4 7 /57.0)y Reading 5 C. Old Meter SizeiType: Icy D New i eter Size/ Type 3 /■ e E. Type of work performed or findings: r //1[P(' e/d y�c ,' i 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man- hours: Crew Members. 11. List Materials Used: /f(C fr . // � g ,er /l /L � 12. If you had an accident1ncident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many trips to do task? Signature Pilt/k..