Loading...
2002_0701 WAFER / Issued: 7 — 1 0 t Finished: 7 -1 Employee: /; 1A (jj 1 Grid map: Name: Address: / / / 2 r , 4 e A 9 ( - 4 1 - 1 Phone Number (HM) (WK): Check for Accuracy test Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. $ackflow Insp. 2. Repair 3. Maintenance 4. glitz Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other • 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: 7. If Meter /Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: Unit # Miles Hrs Equipment A. Old Meter # ?/0 ZSY((O Reading 2.4 S38 B. New Meter 4 3 15 / b Z . Reading y C. Old Meter Size/Type: / D New Meter Size/Type . E. Type of work performed or findings: rf /,dff ff ///P U'/ — 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man- hours: Crew Members. 11. List Materials Used: �� 1 If you had an accidentincident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many trips to do task? Signature