Loading...
2002_0701 WATER Issued: 7 / - ° Z- Finished: - 7 — 1 Employee: ITh XI Qt /� 7& Grid map: Name: Address: / / 1 e-i4 - = X L4 r i Phone Number. (HM) (WK): Check for: Accuracy test Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. Backflow Insp. 2. Repair 3. Maintenance 4. Other Backflow Insp. _ A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety S. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other • 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: 7. If Meter /Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: Unit # Miles firs Equipment A. Old Meter # crap z ei5? Reading 1 (03 B. New Meter # �il�lQ7�r Reading ,5 C. Old Meter SizerType: s hy ft D New Meter Si E. Type of work performed or findings: defr a O dJlu� 07i✓ 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man- hours: Crew Members. 11. List Materials L'sed: /4-'e "IfEe'' 12. If you had an accident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many trips to do task? Signature / is t 6/W n , - ,