Loading...
ST8502-CS 870721P.O. Box 478 Coppell, Texas 75019 214-462-0022 July 21, 1987 Mr. James E. Shannon, Jr. 545 Briarglen Coppell, Texas 75019 Re: Moore Road Improvements Dear Mr. Shannon: Thank you for your letter of July 5, 1987. I have reviewed the schedule for completing the above referenced project with staff. It appears that GTE should try to begin their construction within the next couple of weeks. Construction of their new cable placements we are told will require approximately eight weeks. Upon completion they will remove the rocks and hydromulch the disrupted areas within the parkway. Upon completion of this work, the city will expect you to maintain the parkway in front of your property. I understand the frustration you have experienced with the roadway improvement project. As was conveyed at the property owners meeting, inconveniences could be expected. I believe that the community as a whole has felt to varying degrees the same frustration that you have. The fact that your property fronts this roadway, however, causes a more direct and daily impact on your property versus someone else who resides across town. At the same time, the trade-off of course is that your property has enhanced in value as a result of these roadway improvements versus someone across town. In reviewing the overall content of your letter, please understand that it has never been the intent to penalize, create additional hardships c2 any discomfort to any property owner on Moore Road. At the same time, just as the City of Coppell has an obligation to you, a taxpayer, we have an obligation to the entire community, all taxpayers. As a result, a section of the parkway on the west side of Moore Road was not hydromulched with the rest of the project since GTE was going to merely disrupt it again. Therefore, a decision was made to save your tax dollars which we feel is very important in these hard economic times. Mr. James E. Shannon, Jr. July 21, 1987 Page 2 In closing, I would like to add that we shall do everything that we can to encourage GTE to complete their construction as soon as possible. During their construction please feel free to contact Mr. Steve Morton at 462-0022 who is the city inspector assigned to overseeing GTE's work. Sincerely, - ., L Alan D. Ratliff J City Manager KP/jc cc: H. Wayne Ginn, P.E. Steve Morton Butch Ellison