Loading...
ST8502-CS 870714GINN, INC. CONSULTING ENGINEERS July 14, 1987 Steve Morton City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Moore Rd. - GTE Construction Dear Steve: Per our conversation of July 13, 1987, regarding the planned cable construction along the west side of Moore Rd. by GTE, you may notify GTE that they may proceed with the work at this time. Ashlar Contracting Co. is currently completing the final punch list items on that project. Since we have already sent Ashlar a copy of the final punch list, we feel that the records clearly show what they are responsible for on this project in order to obtain a final completion. Therefore, if GTE does get started now, we do not foresee any problems arising between GTE and Ashlar that would create confusion on Ashlar obtaining final completion. The reason that we desire to have GTE get started at this time is so the residents along the west side of Moore Rd. can have grass growing in front of their property as soon as possible. We have discussed this work with GTE to let them know that correspondence would be sent to them later this week which would allow them to begin scheduling this work. Your formal notice to GTE will be consistent with their request in their letter to you dated May 18, 1987 of which we were copied. We would like to request for you to copy us on your correspondence with them. Also, per their correspondence, we sent GTE the Moore Road construction plans on 5/19/87 that they had requested. It is our understanding that you shall do the inspection and acceptance of the work performed by GTE. Feel free to call upon our field staff should questions or conflicts arise on Moore Road as a result of GTE's work versus the Moore Road Improvements project. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 Mr. Steve Morton July 14, 1987 Page 2 Please call if you have any questions. Sincerely, /Q ~ Kevin Peiffer~ KP/km cc: Alan D. Ratliff Steve Goram H. Wayne Ginn, P.E. Butch Ellison