ST8502-CS 870624MOORE ROAD IMI~ROVEMENTS
FINAL WALK
JUNE 24, 1987
10:30 AM to 3:30 PM
Persons in Attendance:
Ray Bailey
Rueben Martinez
Butch Ellison
Kevin Peiffer
Steve Morton
Carl Bass
Tommy Koopman
~./~.-~Glidewell
Per Birdsall
Dana Kamp
W. K. Wolfe, Jr.
Ronnie Stone
Richard Diano
Ashlar Contracting Co.
Ginn, Inc.
City of Coppell Development
" " " Water
" " " Water
" " " Fire Dept.
" " " Streets
" " " .Streets
Ashlar Contracting Co.
Uvalde Construction Co.
City of Coppell Parks Dept.
PUNCH LIST
Project MOORE ROAD Ib[PROVEMENTS
Loca!;on Coppell, Texas
Inspection was conducted at above projecz by
No 254
Date June 24~ 1987
Ginn, Inc./City of Coppell at 10:30 AM o'c!ockthisda~e.
REPRESENTATION
CONTRACTOR OWNER
ASHLAR CONTRACTING COMPANY
CITY OF COPPELL
ENGINEER.ARCHITECT
oe~,g,, Kevin Peiffer
Sta~ Soec..
Jol~
Rueben Hartinez
'h~ fo!lowing items are to be co,,ected c, completed to comply with the contrac~, documents:
T~,,c~e c~ ,"~De:~,:'~ Checl, l::~,a! XX 1 '~r Guar Gua~r.
NO.
O2
ITEM
Hot mix around valves in intersection.
Add 1 yellow button to close off median & white button jusg in front of
of paver crossing.
Route and seal crack on inlet by store.
uested traffic loop at N. end of Moore Road.
Remove old black gas pipe in bar ditch On N. side of
Remove trash at NW corner of Sandy Lake/Moore Rd.
Clean out storm drain manhole at N. side Sandy Lake/Moore Rd.
Rd.
holes where traffic buttons were removed.
10 City would like to see lft-turn arrow at N. end Moore Rd. onto Sandy Lake.
11City would like STOP bar same location.
12 i Raise fire hydrant at store, N. end of Moore Rd.
13 Route and seal crack on curb and gutter in front of house at 175 Moore Rd.
14 Traffic buttons put on top of centerline ~oint; city has noted that
some buttons have cracked and are loose.
15Remove the "toe stumper" or make the sidewalk & inlet top match out.
125 more.
16 There is no expansion joint on sidewalk in front of day care. -
17 Route and seal joint on day care driveway.
~ Route and seal crack on alley driv~ust S~ of dmz_care.
19~.__~ curb joints on S. drive of day care. if no expansion installe
PUNCH LIST
Proiec', MOORE ROAD I~[PROVEMENTS
Loca:;on Coppell; Texa.~
inspection was conducted at above project by
No. 0254
REPRESENTATION
CONTR ACTOR-OWnER
AS]~LAR CONTRACTING COMPANY
CITY OF cOPPELL
Date June 24, 1987
at 1 {3 _. Ctt3AM o'clock this ciate.
ENGINEER.ARCHITECT
Kevin Peiffer
$1aff Soec..
Jo~ s~p~i~%ben Martinez
Th( fo!lo~qng items are to be cor,ected c, comp!eted to com;31y with t~.e contrac~ documents:
NO. i ITEM
20 I Clean up excessive joint sealant on alle~ drive S. of da7 care. ,
21 City noted no lay dwn curbs on drives from fire station on W. side to
Sandy Lake Rd.
22 Install fire hydrant reflectors on all.
23 Ro.ute and seal crack on Horn's drive.
.24 Locate fire hydrant valve across from Mr. Dobecka's (lst house just
S. of trailer)
25 Route and seal crack on pavement in front of house as stated in item #24.
26 Repair concrete at expansion joint.just S. of ~uail.
27 Resolve bird bath at curb and ~utter S. of ~uail on E. side (app.40'lonm).
28 No lay down curb on alley between ~uail and Pheasant Dr.
29 Seal repair pave joint (also route and seal cracks) at fire station
approach.
30 Resolve bird bath on ~utter E. side~ S. of ~uail.
31 Install saw ~oints at Median in front of fire station.
32 Locate fire hydrant valve E. side of Moore at Pheasant.
33 Seal expansion joint on W. half of pavement~ front center of School S.
of fire station.
34 Resolve bird bath on S. drive at ~chool (located toward
35 Resolve bird bath directly across from same in item #34.
36 Call GTE on phone cable box to be raised & about pedestal at S. end of
School.
37 I No lay down curb on alley, S. of School.
PUNCH LIST
Proiect MOORE ROAD I}fPROVEMENTS
Loca'.i o,~ Coppell, Texas
Inspection was condocted al above project by
CONTRACTOR OWNER
C°Y:~°~ASHLAR CONTRACTING COMPANY
CITY OF coPPELL
No,
Ginn, Inc./City of
REPRESENTATION
,~laf f Soec.
Date J~ne 24. 1987
Coppell at ~)..;..c[0_-~ o'clock this cta~e.
ENGINEER.ARCHiTECT
Kevin Peiffer
Job S~pervi$o,:
Rue~e~ M~tinez
Th( fo!towin ~tems are to be cor,ected o? cc. mpteted to comply with the contract documents:
NO, i ITEM
38 I paver ramp at S. drive on School ~oing E. and W. High.
39 Raise valves to be flush with pavers on W. side at Shadowcrest.
40 Replace water valve lid at NW corner of Shadowcrest intersection.
41 Clean out gutters on W. side of Moore o~ Shadowcrest intersection.
42 Route & seal crack on alley between Shadowcrest & Pheasant.
.43 Bird bath in front of pavers on W. side of Shadowcrest intersection; also,
on E. side.
44 Route & seal crack on E. half of pavement rup~nK parallel with street
at S. side of Shadowcrest intersection.
45 Some centerline buttons cracked in this area noted in Item #44.
46 Route & seal crack on N. side of alley~ W. side of Moore Rd. between
Shadowcrest & Havencrest.
47 Route and seal crack on inlet E. side Moore Rd., N. of Havencrest.
48 Route & seal crack on 2nd & 3rd panel N. of Havencrest, E. side,
49 Chip down to ~rade the retainer curb for ~avers ~t NE corner of Havencrest
intersection.
50 Locate valve NW corner of Havencrest intersection, repair paver rmmn-
subgrade, pavers~ walks~ etc.
51 Route & seal two cracks on blockout for alley between V~]]~nn~ ~
Havencrest.
52 Route & seal storm inlet N. of Villawood on W. side.
53 Inlet top or walk not flush on E. side of Moore Rd. just N. of V~]~nnH-
54 t Remove forms on pavers at NE corner of Villawood intersection. ~
PUNCH LIST
Projec', MOORE ROAD IMPROVEMENTS
Loca~io~ Coppell ~, Texas
Inspection was conducted al above proiect by
No 0254
Ginn. Inc./City of Coppe]l
REPRESENTATION
CONTRACTOR OWNER
ASHLAR CONTRACTING COMPANY
CITY OF coPPELL
Date June 24. 1987
at ~ O'CloCk this date.
ENGiNEER.ARCHITECT
~"*'g~ Kevin Peiffer
SiM( Soec..
Job $opewiso,:
Rgeben Martinez
fo!low{n itemsare ~O De corrected or com~!eted~ocomplywith the contract documents:
NO. t ITEM
55 conCrete slag on most inlet toPs.
56 Raise valve at NW corner of Villawood intersection.
57 Replace valve stack at NW corner of Villawood intersection.
58 Need 2' valve extension on valve, just past Villawood at bridge.
59 Resolve bird bath in front of pavers at SW corner of Villawood inters.,
60 Resolve bird bath, SE corner of Villawood intersection at pavers along
curb.
61 Repair brick pavers at edge to sidewalk at SE corner of Villawood inters.
62 Fill sink hole on W. side between walk & curb just N. of culvert rS. of
Villawood).
63 Grout inside of 18" RCP inside box culvert (note top portion of pipe where
grout fell out and also smooth up).
64 Flow line of culvert box holds water approximately 1-1/2" deco mt W. ~nd-
65 Grout first ~oint inside 36" RCP .~ust past the bend located inside of
culvert box.
66 Grout inside of 24" at 2nd joint inside box culvert.
67 Grout & seal joint at top of culvert box inside at E. end.
68 Relay loose decorative stone on W. side of culvert at flume ooenin~.
69 ! Vertical panel by tree needs to be picked up.
70 Route & seal crack on driveway N. of Greenrid8e.
L
71 Storm sewer lid stuck at Moore & Greenridge.
72 Inlet top same as item #53~at Greenridge.
73 ~ Route & seal crack on driveway to the S. at 380 Moore Rd.
PUNCH LIST
Proiec: MOORE ROAD I~[PROVEMENTS No. 0254
Location Coppell, Texas
Inspection was conducted at above project by
Ginn_. Inc./C~ty
REPRESENTATION
Date June 24. 1987 ..
P.~pp~] ] at _.I,0..L0.Q-,~ o'clock this Oate.
ENGiNEER.ARCHiTECT
Kevin Peiffer
CONTRACTOR'OWNER
C°~"~=~°~ASHLAR CONTRACTING COMPANY
tO~er CITY OF COPPELL
Job
Rueben Martinez
Th~ foHo~in ~tems are 1o be cor,ected c, completed to comply wi~h the contract documents:
NO. i ITEM
74 Bird bath at ~utter ~ust N. of m~lbox at 380 M~ore Rd.
75 Received complaint about Mesquite tree being damaged by contractor (see
homeowner & resolve).
76 Repair paving at centerline N. of M~adowview.
77 Can't get on valve at NW corner of Meadowview furthest N.
78 Route & seal cracks on both inlets on Meadowview W. side of Moore.
79 Cracked pavement at centerline, 3rd panel S. of Meadowview intersection.
80 Two bird baths at driveway~ SE corner of Meadowview intersection.
81 Bird bath at other driveway Oust S. of Item 80.
82 Route & seal crack at centerline on 3rd & 4th panel N. of Briarglen
(on 600 Briar Glen).
83 Missing valve at NW corner of Briarglen.
84 Missing saw joint N. of Briar~len on pavement, W. half.
85 Bird bath at Briar~len NE corner.
86 Bird bath at Briar~len NW corner.
87 Asphalt transition at West side of Moore on Briarglen, holding water in
places. City wants it sealed.
88 Repair paver retaining curb at SE corner of Briarglen intersection (by
walk).
89 Missing valve SE corner Bethel School ~hould be tw~ and one at NE corner.
90 601 Briarglen, Route & seal crack at driveway.
91 . Also, same on house directl~ W. of item #90.
92 i Route & seal crack at centerline on the 4th panel N. of Bethel Schoo]/Mo~r~
intersection.
PUNCH LIST
Proiect MOORE ROAD IMPROVEMENTS
Local;on Coppell, Texas
No 0254
Inspection was conducted at abcve project by Ginn, Inc./City of Coppell
Date June 24, 1987
lO:~O AM o'clock this date.
REPRESENTATION
CONVRACTOR.OWNER
ASHLAR CONTRACTING COMPANY
CITY OF COPP'ELL
Des,gr~
ENGiNEER.ARCHITECT
Kevin .Peiffer .
Job s,o,~i,~ueben Martinez
The fo!lO~ring items are ~o De co~'ec~ed c~, comp!eted to comply wi~h the contract documents:
NO. i ITEM
93 Raise valve flush with pavers at NW corner of Bethel School/Moore inters.
94 Bird'bath at SW corner in front of paver of Bethel School intersection.
95 Clean out inlet at Bethel School.
96 Re-do patch on pavement edge next to brick pavers on W. side of Moore,
S. of Bethel School intersection.
97 Raise pull box and grade area at SE corner of Bethel School intersection.
98 Route and seal centerline at Bethel School/Moore & curb return - pavement
crack.
99 Route & seal 2 cracks at centerline S. of Bethel School on 1st Panel.
100 Trim down redwood joint on W. side of Moore Rd., S. of Bethel School,
2nd joint. ,,
101 Route & seal crack on inlet W. side of Moore Rd., N. of Cristi Lane.
102 Inlet top & walk at W. side Moore, N. of Cristi, same as item #53.
103 3-panel sidewalk adjacent to inlet N. of Dove needs .replacing.
104 Trim expansion .~oint material at Dove Circle.
105 I Route & seal crack on 1st panel S. of Dove at centerline.
106 Inlet top & walk at E. side, S. of Cristi, same as item #53.
107 Seal crack on gaps between waIk& curb on E. side of Moore, N. of Swan
intersection.
I108 Route & seal crack on 8th panel N. of Swan on W. ha%f 9f Moore Rd.
109 Inlet top & walk at E. side just N. of Swan, same as item #53.
110 Route & seal crack on inlet in Item #109. .I
111 ! Route & seal crack on panel in front
of
Swan
intersection.
" PUNCH LIST
Pr oiec',
MOORE ROAD IMPROVEMENTS
L~a~ior, Coppell, Texas
Insp~c~ionwa$conduc~ed~1 ~bovepreject bY
Ginn,
0254
No
Inc./City of Coppell
REPRESENTATION
CONT P ACTOR OV', r'; E R
ASWT~R CONTRACTING COMPANY
O~,.~e, CITY OF COPPELL
Sla~~r
Dace June 24, 1987
10:30 AM o'clock this da~e.
EN~NE ER.ARCHITECT
Kevin Peiffer
Rueben Martinez
foHowin ~!em$ are to be cor~ecte,O c' com?!e~ed to corr, pfy wi~h ~[he contraCl Oocumen~s:
NO ITEM
-112 Trim ram neck off inside of double 24" pipe crossing Carter Rd. and
clman excess grOut offinside of pipe.
113 Grout the lateral to inlet off item #112.
114 Clean out storm drain manhole just S. of Swan on E. side of Moore in
sidewalk.
115 Clean out excess concrete & smooth bottom of inlet on E. side, S. of Swan.
116 City wants grates on all lar~inlets on headwall openings of culverts.
117 Grout exposed pipe joint with epoxy on W. side of the 36"RCP crossing
S. of Carter.
118 Sod rip rap under bridges.
119 Paint outside face of beam and underneath caps.
120 Route & seal cracks on sidewalks terminating at bridge header.
121 Re-bar on NW slope needs to be pulled or cut off.
122 Redo curb patch at expansion joint just S. of bridge on E. side.
123 Route & seal all cracks around median S. of bridge.
124 I Trim all thermoplastic markings at least 18" from face of curb & get it
i out of the gutter line.
125 The S. most STOP bar at its E. end is creeping & RR crossing loose in
places.
126 Replace conduit on pole fOr signal system on NW section of intersection.
127 Patch asphalt where traffic buttons were.
128 I City wants better alignment of signal & traffic lanes.
129 I Trim ram neck sealant of inside of 18" pipe crossing @ Moore Rd., S. of
~ ~: ,., ','~.-~.~' RR tracks - has to be done
2 C~~'':' ' : ~: '~"~-"' '~
way
PUNCH LIST
MOORE ROAD IMPROVEMENTS
COPPELL, TEXAS
No 0254
Date - June 24; 1987
at 10:30 AM o'clock this da~e.
REPRESENTAT ON
Loc~'o~;
Insp.,z~ion wa.< conoucted ~1 above project by
CON'TRACTOR OWNER
I ?:'~:"C"ASHLAR CONTRACTING COMPANY
CITY OF COPPELL
ENC-INEE R.ARCHITECT
Th, ~c,'io,',i'~ items are to be cot 'er. ted o~ completed ~o compiy wi~h the contrac~ document:
%0 i ITEM
130 i Need Need to clean e×cess epee7 off of street (12~ ~oore & near ~ tracks
131 Route & seal cracks on S. most inlet, S. of bridge o~ W. side.
132 Route & seal walk, N. of inlet, S. of bridge, W. side.
133 Do same to pipe crossing S. of bridge but N. of tracks same as item #129
134 Need solid button pattern for no-passing zone across bridge.
135 Need to place 'riser of 12" valve that is in the street just before the
bridge going S. and paint cap blue,
136 Need to place riser on 12" valve at end of line and paint blue.
137 Total of 159, 4" Pl174 traffic should be removed off centerline.