Loading...
2002_0814 WATER Issued: « /' 02-- Finished f Employee: F Grid Map: Name: Address: -0 i• 75 Pdafit teal Phone Number (HM): (WK): Check For Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp, 2. BM& 3. M_ 4. Other Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety • 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: Al . 5 5 � of a�C `t t, er for m i - J v 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO C. Was Customer Notified VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter # q/62 ZS Z2 Reading /o fQ q 4 B. New Meter ago 4 ((Cc 7 Reading -6 C. Old Meter Size / Type 5 78 x �f New Meter Size / Type 41,451k7e 5 *K 3 �j / E. Type of work performed or findings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man hours: Z Crew members: 1 l 1. List materials used: t?. If you had an accident, incident x wile arming this request, did you report it? YES or NO 13. Water Utilities meter inspection: or FAIL 14. How many trips to do task? Si cure