Loading...
2002_0814 WATER Issued: ' / ° ` Finished: n Employee: � C Grid Map: Name: Address: (O/ 2 % .( l Phone Number (HM): (WK): Check For Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp. 2. Rank 3. Maintenance 4. glik Backflow Insp. A. Main Line A Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety • • 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: 14, s s j 5 ef wet. kr" 7e0 I 14/z.e.441' 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO • C. Was Customer Notified: VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter # 't/ 2 574 '3 C./ Reading l 1 9 B. New Meter # z11 4/43 Reading C. Old Meter Size / Type � A 3 4/ New Meter Size / Type $ V4 57 A 77sx 3 �f E. Type of work performed or findings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man hours: Z 4 i 4 ;" Crew members: l 11. List materials used: 12. [t you had an accident ;incident while p orming this request, did you report it? YES or NO 1 3. Water Utilities meter inspection: ce0 or FAIL 14. How many trips to do task? 17-1-sex Signature