Loading...
2002_0627 WATER Issued: Finished: Employee: Al C/ v d Grid reap: Name: Address: /0 / 3 Ili Phone Number: (HM) (WK): Check for: Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. Backflow Insp. 2. Repair 3. Maintenance 4. Other Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equ pment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: (' h 6,19 f% ` f /;.J f f C r\ 7. If Meter /Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: 3 Unit # Miles Hrs Equipment A. Old Meter # 1(0'�. 5 6. 3 7 Reading 0 7 1 3 2 B. New Meter # .2 (0 y / ( & ' Reading is C. Old Meter Size /Type: D New Meter Size/Type E. Type of work performed or findings: 61;5 0 c/ 9' d xi ri") ci i ftt p �i r m z4 e� G.- 0 ,3 *' 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man- hours: / Crew Members. / 11. List Materials Used: 12. If you had an accident "Incident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: ass or fail 14. How many trips to do task? Signature `0 V 6"."-k