Loading...
2002_0701 WAFER Issued: 7-1 Finished: . 7 - 5 -4 Z Employee: Dc4D fr � Grid-map: Name: Address: / Z /77;zr4_1z--- Phone Number: (HM) (W): Check for: Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. $ackflow Insp. 2. Repair 3. Maintenance 4. Qther Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: 7. If Meter /Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: Unit # Miles Hrs Equipment A. Old Meter 7 9 i Dqp, I)`73 Reading / 7 %/j B. New Meter # qb' ii / Reading / 7 C. Old Meter Size/Type: I ; (1 t: h D New Meter SizefType i (di E. Type of work performed or findings: rr.0-U ZL oAcl, n P Li Ov 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man- hours: Crew Members. 11. List Materials Used: S kd- 1?. If you had an accidentlncident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many nips to do task? � . C Signature V" J t/ - 1'w