ST8502-CS 861230ASHLAR
CONTRACTING COI ,PANY
BOX 713
LEWIS¥1LLE, TEXAS 75067
214/436-5509
The Paving and Limeing operations for Moore Road will begin at Sandy
Lake Road and head South to Beltline Road.
The people with one drive going to Moore Road will be asked to park
their cars in front of their houses so we can pave thru to the intersection
or thru the intersection. This way we only have to connect to the street
with their drives instead of paving the street and their drives.
The people with two: drives, we propose to pave thru one drive and
leave the other one open until we can complete the other drive. After we
complete one drive we will procced to complete the other drive and street.
We wish to stagger intersections, which means pave Raven lea~ing
Quail open, pave Pleasant leaving Shadowcrest open, etc...We will open
all paved thru streets first, then come back to finish the rest of the
street intersections.
We wish to pave thru the alley intersections, then come back to
finish them after all the street intersections and driveways are completed.
We feel the streets and driveways are our first priority mainly because
the alleys are accessible from the side streets to which they also connect
to.
All closed intersections will have a Type 111 Barricades with a Road
Closed sign posted on it.
F
I
Z
mm~m~mm ~