Loading...
ST8502-CS 861216CONTINENTAL PIPE UNE COMPANY 1909 Southwood Drive~ Lake Charles, LA 70605 (318) 491-5855 December 16, 1986 Certified Mail #P018-669-929 Mr. Frank Trando City Manager P. O. Box 478 Coppell, Texas 75019 Dear Mr. Trando: Modifications to the Con-Dot 6-inch products pipeline to accommodate the City of Coppell's Moore Road construction at Belt Line Road were completed on September 12. The final completed cost of the project is $13,954.10. A summary of these costs are included on the enclosed invoice number WWL0029. We would appreciate payment within 30 days of the date of the invoice to my attention at the above address. If you have any questions, please contact me at (318) 491-5852, or Larry Weiler, the project engineer at (318) 491-5867. Sincerely, David A. Vanderpool District Engineer 111/20: LGW/sb Con-Dor Pipe Line Company P.O. Box 1267 Ponca City, OK 74603 The. City of Coppell P.O. Box 478 Coppell, TX 75019 December 3, 1986 Invoice No. WWLO029 We 'charge your account for costs to concrete-coat and relocate our 6-inch products line to accommodate construction by The City of Coppell. The construction is a new roadway next to the existing Moore Road. Materials 160' -8" of 6" concrete-coated pipe 1,753.66 Contract Services Watkins Construction Company Inc. Chemical Plant Services Inc. H&H X-Ray Services Inc. Federal Express 4,450.00 900.00 636.00 105.75 Company Expenses Expense and mileage report--Larry Wailer Salaries--Larry Wailer (136 hours) Jay Jones (26 hours) Employee Benefits ($2,073.22 x 30.33%) Overhead--applled to direct company labor ($2,073.22 x 20.29%) --applied to all costs ($12,459.02 x 12.00%) Total amount due from The City of Coppell 1,490.77 1,569.44 503.88 628.84 420.68 1,495.08 $13,954.10 TCS:MG:clp t2-03-86