ST8502-CS 861117GINN, INC. November 17, 1986 CONSULTING ENGINEERS Mr. Ed Powell, City Engineer P.O. Box 478 Coppell, TX 75019 Re: Moore Road -- Payment Application #9 Dear Mr. Powell: In reference to your question regarding an apparent overrun on pay item 440, Reinforced Steel, for the above referenced project, the actual quantity shown 72,956 lbs is correct. The differences between plan quantity and actual quantity are due to the change in bridge selection and type of bridge railing selected by the Coppell City Council and indicated on Change Order No. One (1) which was approved by the City. If you have any questions, please call us. Sincerely, Kevin Peiffer ~ - /ss cc: wayne Ginn 16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611 GINN. INC. February 13, 1986 CONSI'LTING ENGIN'EI IIS Mr. Ed Powe!l, City Engineer P.O. Box 478 Coppell, TX 75019 Re: Change Order No. 1 -- Moore Road Dear Mr. Powell: Enclosed please find Change Order No. 1 for the Moore Road Improvements project. The items shown on attachment number one of the Change Order reflect the revised quantities required for the modifications described below for the bridge. Execution of this Change Order will result in a reduction in the contract price by $72,038.48, which results in a new total contract amount of $1,866,313.47. The purpose of this Change Order is to economize the cost of the bridge without sacrificing the aesthetics the City of Coppell is desiring. This is accomplished by utilizing a standard Texas Highway Department (T.H.D.) bridge design and modifying the superstructure by replacing the standard type C-4 (aluminum) rail with a concrete barrier rail. The original bridge selected by the City had a sub-structure consisting of pier walls with cast-in-place T-beams and girders. Results of the bidding showed that the proposed T.H.D. bridge design which utilizes pier columns and Type C · prestressed concrete beams is more economical (see bid tabulation enclosed). We have reviewed this Change Order and recommend approval. Sincerely, Kevin Peiffer /s r Enclosure cc: Wayne Ginn ORDER ONE (1) PRt)J ECI-: MOORE ROAD DATEOFISSU~NCE: December 13, 1985 O\kNliR: City of Coppell P.O. Box 475 Addrc,,~ Coppell, TX 75019 CONTRACTOR. ASHLAR CONTRACTING CO. OWNER's Projec~ No ENGINEER: CONI'R-\CT FOR: Street and Drainage Improvements ENGINEER'* Prt:iec: No.. J-254 You ,,re directed to make the follo~ lng changes In the Contrac! Documents. D¢,crip:~,.n: Change bridge select,on from Base Bridge to Alternate Bridge. rail±ng on Alternate Bridge ~ith Base Bridge type rMl±ng. Pu:-p¢-cofChangeOrder: Modify bridge to reduce contract amount. Substitute -\ttachments: tList document* supporting change~ Attachment 1 CHANGE IN CONTRACT PRICE: Original Contract Price S 1,938,351.95 Previous Change Orders No. S 0 tO No. Comract Price prior to th~s Change Order $ Ne~ t.r~.~+~dc,'reas¢t ot'lhi* Change Order 72,038.48 Contracl Price ~ ilh all appro', cd Change L}rder, 1,866,313.47 CHANGE IN CONTRACT TIME: Original Contract Time Net change from prex ious Change Orders Contract Time Prior to this Change Order Net Increase {decrease} of this Change Order Contract Time ~ith all approved Change Orders -X PPR( )\ }. D II. MOORE ROAD IMPROVEMENTS CONTRACT CHANGE ORDER NO. 1, ATTACHMENT NO. 1 I. DEDUCTIONS 1. Delete Base Bridge and all applicable pay items = $ Item 450 - Rail (Type C-4) Mod. Alum. (Alternate Bridge Item) - Delete 376 LF @ $45.00 Item 442 - Structural Steel (Armor Joint) Deduct 270 LB @ $1.40 Subtotal Deductions = $ 481,435.30 16,920.00 498,733.30 ADDITIONS 1. Add Alternate Bridge and all applicable pay items 2. Item 421.1 - Class A Concrete - Add 2 CY @ $1,150.00 3. Item 421 - Class C Concrete (Abuts.) - Add 5.6 CY @ $370.00 4. Item 421 - Class S Concrete (Slab) - Add 2.5 CY @ $310.00 5. Item 440 - Reinforcing Steel - Add 5589 LB @ $0.47 6. Item 450 - Concrete Barrier Rail (Bridge) Add 392 LF @ $178.00 Subtotal Additions = $ 349,144.99 2,300.00 = 2,072.00 = 775.00 = 2,-626.83 426,694.82 III. Total this Change Order No. 1 = $ - 72,038.48 .OJECT: MOORE ROAD IMPROVEMENTS SHEET 4 OF 6 PAYM~4T ~., PAY QUANTITY AMOUNT ITEM DESCRIPTION PLAN UNIT TO UNIT TO NO. QUANTITY DATE PRICE DATE 582.2 Relocate H20 Service 4 EA 4.00 315~00 1260.00 582.3 Install H20 Service 1 EA 582.4 30" DI San. Swr. Main 152 LF 112.00 90.00 10080.00 582.5 Adjust H20 Valve 20 EA 55.00 582.6 Relocate/Adjust S.Swr. Mair 1 EA 400.00 582.7 12" DI, Class 51 662 LF ~,OO 34.00 22208,00 582.8 12" Gate Valve 2 EA 582.9 Relocate Fire Hydrant 1 EA 700.00 582.9 6" DI Gate Valve 1 EA 591.1 Stone Facing 1,256 SF 1.00 618.1 3" PVC Conduit 387 LF 192.00 10.50 2016.00 674.1 4" Yellow Dbl Refl. Button 509 F.A 6.00 676.1 8" White Refl. Button 22 EA 34.00 676.2 8" Yellow Refl Button 99 EA 36.00 666 Thermo Markings 335 LF 8.00 ..... No Pay Item 0 416 18" Drill Shafts 80 LF RN.00 43.00 3440.00 416 30" Drill Shafts 482.5 LF 485.62 ~ 75.00 36271.50 421 Class C Conc. Abut. 50.6 CY K6~?fl 370.00 ?n?oa nn 421 Class C Cont. Bends 43 CY 43.00 370.00 15910.Q0 421 Class C Cone. Slab 257.2 CY 2~9.70 310.00 80507.00 425 Type C Beams 1;183 LF 432.1 Concrete Riprap 1,020 SY 1065.90 '35.00 ~75~6.~0 440 Reinforced Steel 67,367 LB 72956.00 ~ .47 ~4289_~2 442 Structural Steel 2,250 LB 1980.00 1.40 2772.00 450.2 Bridge Rallin~ ~92 LF 392.00 ~'~ Oq ~9776,00 546 Class ~ Appr. Slab 48.3 CY 48,~0 260.0~ 125S8.00 611.1 Bridge Electrical 1 LS .~ !3,000.00 7~90.00