Loading...
2001_0215 WATE • �f Finished 4r ivL LIssued: I Employee: Grid trap: Name: (, 43 c P-A- A• • • • _5 /1 _ - . Phone Number. (FLT!) (WK): e/ 7 - !p y0 _ 3 7 7,X Check for. Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. $ackflow Insp. 2. Repair 3. Maintenance 4. Other Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety • 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services X a.L 4/2A UAL (pp t, Ajr 1 7. If Meter:Ser ice Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: Unit # Miles Hrs Equipment A. Old Meter # Reading B. New Meter # Reading C. Old Meter Size/Type: D New Meter Sizerfype E. Type of work performed or findings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man- hours: Crew Members. 11. List Materials Used: 1 ec a,. �5 C u� j '®wi ey5 S: ele_ < 12. If you had an accident/Incident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail • 14. How many trips to do task? Signature /