Loading...
ST8502-CS 860804GINN, INC. August 4, 1986 Ashlar Contracting Company Post Office Box 713 Lewisville, Texas 75067 Attention: Mr. Dan Mill Re: Moore Road Improvements CONSULTING ENGINEERS As formal notice, the City of Coppell has informed us that the unit prices for items one and two, as submitted in your June 20 correspondence, are accepted. Item three (mobilization) we do not recognize as applicable since your people are currently on the jobsite. The total anticipated cost of this additional work based on your unit prices is approximately $7,840.00. A copy of your June 20 correspondence is attached. Please proceed at this time to incorporate the additional work into the scope of this project. Sincerely, Kevin-Peiffer KP:jc Attachment CC: J. E. Powell, P.E. H. Wayne Ginn, P.E. Randy Fleming, Inspector Rueben Martinez, Inspector 16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611 ASHL' R CONTRACTING CO'ANY BOX 713 LEWIS¥1LLE, TEXAS 75067 214/436-5509 June 20, 1986 GI.~, INC. 16135 Preston Rd., Suite 106 Dallas, Texas 75248 ATIN: Kevin Peiffer RE: ~bore Road / Coppel 1, Texas Dear Sir; The prices to do 8" Water Lines for the school are as follows: 1. 8" SCH 200 PVC 90 L.F. $ 46.00 2. 8'~8" Tapping 2 EA. $ 1,850.00 Sleeve &Valve. 3. Mobilization $ 390.00 $ 4,140.00 $ 3,700.00 $ 390. O0 CHANGE OP, D~ TOTAL * INCLUDES PLUGGED ENDS $ 8,230. R~spectfully, Daniel A. Mill IN/hz