Loading...
ST8502-CS 860731GINN, INC. July 31, 1986 Mr. Sam_Wilson City 1500 ~rilla, Room ~L1BN Dallas, Texas 75201 CONSULTING ENGINEERS II II ! i Attention: Mr. Jack Antebi ~ t tlieM00~:e'a;acl/Bel~ Re: a Dear Mr. Wilson: Enclosed is a copy of the traffic signal study that war£anted the signal installed at the above referenced intersection. After the City of Coppell determined that a traffic signal was warranted at the intersection in May 1984, the City used their own funds to install the signal because we understood that Dallas would not fund the installation costs. Since 1984 the land development and traffic volumes generated by that development have increased enormously. The fact that Moore Road is currently the only north/south thoroughfare in the residential area until Mockingbird Lane or MacArthur Boulevard is completed, we see this signal as vital to the needs of Coppell in order to move traffic smoothly during the peak hours. On behalf of the City of Coppell, we respectfully request that this signal not be removed until the matter can be thoroughly discussed between the two cities. After your further consideration, please advise our office of your determination on this matter so that we may inform the Coppell City Council, who can in turn properly inform their citizens. Also, please furnish a copy of your traffic warrant study so that we may compare it with our study. Thank you for your attention in this matter. Since~r~y H. Wayne Ginn, P.E. KP/HWG/sr Enclosure cc:~or Lou Duggan Frank Proctor, City Manager ~Powell, City Engineer~''~ Larry Jackson, ~ity Attorney_ Pres~nRoad' ~uitel~ ,Dallas, iexas75248' Phone214/386-6611 161~ T~_AFFIC~GNAL WARRANT STUDY .~O_O__R~_I~O_A_~_ BELTLINE ROAD_ The intersection of Beltline Road and Moore Road is at the south end of Moore Road at the boundary between the City of Coppeil and the City of Dallas. Both Beltline Road and Moore Road are two lane, two-way roadways. Beltline road has one lane approaches to the intersection from both the east and the west. Moore Road has a one lane approach to the intersection southbound. TRAFFIC VOLUME DAT~_;. A manual count was conducted at the Moore Road-Beltline Road intersection during both the AM and PM peak periods. The results of that count are given below. ~3ELTLINE ROAD_ WB EB TOTAL SB 6:00 AM 15 10 16 26 18 30 18 30 48 37 45 32 51 83 54 7:00 A~ 25 62 87 ~44 65 174 15 36 68 104 119 30 42 69 111 131 45 62 64 126 170 8:00 AM 43 82 125 466 122 542 15 52 47 99 105 30 51 54 105 75 45 38 48 86 53 9:00 AM 34 27 61 351 46 279 4:00 PM 15 96 48 144 14 30 86 51 137 21 45 -89 55 144 25 5:00 PM 121 51 172 597 27 87 15 146 58 204 30 30 ~54 66 220 26 45 133 59 192 14 6:00 PM 157 74 231 847 35 105 15 120 54 174 25 30 101 41 142 30 45 92 47 139 27 7:00 PM 92 33 125 580 24 106 Traffic Signal Warrant Study Moore Rd/Beltline Rd Page -2- SIG.NAL WARRANT ANALYSIS: The traffic volume data was applied to the Traffic Signal Warrants given in the Manual on Uniform Traffic Control Devices published by the U. S. Department of Transportation. In order to have a signal installed, an intersection must satisfy at least one of the signal warrants. The warrants are listed below: WARRANT # TITLE 1 2 3 q 5 6 7 8 9 10 11 Minimum Vehicular Volume Interrupt ion of Continuous F low Minimum Pedestrian Volume School Crossings Progressive Movement Accident Experience Systems Combination o.f Warrants Four Hour Volumes Peak Hour Delay Peak Hour Volume RESULT- CONCLUSION: The Peak Hour Volume Warrant is met at the Moore Road-Beltline Road intersection during the 7:00-8:00 AM hour. Therefore, a signal may be installed.