Loading...
ST8502-CS 860721ASHL AR CONTRACTING COI PANY BOX 713 LEWISVILLE, TEXA~ 76067 214/436-6509 July 21, 1986 Kevln Pelffer Glnn, Inc. 16135 Preston Road, Suite 106 Dallas, TX, 752q8 R Road Improvement~.~ Oear Kevin: Enc!osed is a letter from Netcalf Construction Co.. detaillng the conflicts with existing utilities and structures. We are trying our best to handle the conflicts, but we have very little clout with the utlllt~.companys. Any help with these problems from Ginn or the City of Coppell would be greatly apprecfbted. If we can be of service, please cai1 at the above captioned number. Sincerely, W. K. Wolfe, Jr. Vice President cc: City of Coppell£Ed Powe11 Ginn, Inc. - Ruben Nartinez Ashlar Contracting -~Ray Bailey GARY METCA CONSTRUCTION CO,, INC, JUL d Ashlar Contracting Company .~ten: Red Wolf P.O. Box '/13 Lewisville., Texas 75067 Moore Road Project Coppell , Texas Dear Sir: ~ We suggest that Ginn & Associates and the (~ity of Coppell · stop time on the above referenced project. Until. at such time as the following listed conflicts be remedied. 1. GTE is in conflict at the following locations: A. 5'x2' precast box culvert approx. ~ station 1+40 B. Lateral Line 1D aprox. ~ station 1+'/,9 C. Lateral Line 1C~aprox. ~ s~ation 5+40 D. 7~x5' Box Culvert aprox. ~ station 24+7~ E. b' Standard curb inlet intersection Vil~awood & Noore Rd. P. b' Recessed inlet aprox. ~ station 22+88 2. Lone Star Gas is in conflict at the following .I.oc~tions, A. 7'x5' Bo× Culvert lb" Eas line aoro×. ~ station 24+73 B. 'Pne g~ company has been notified of p~s'ib]e ~ti.lity conY]icts and promised to come out and d[~ up I. ines to locate in the following locations as o~' th'is date they have taken no action. B1. lateral 14A and 14B intersection (:reenridge [)r. and Moore Rd. B2..I~ateral. 1)B aprox. ~ station 27+26 B',~. ],ater~l 1DA and 15B intersection Me,~dowv,.iew l,n. and Moore Road B4. Lateral 1'5.~ aprox. ~ station 30+20 3. City of Coppell Water Dept. Excavating - Ditching ,\. 'ye nave several water lines to lower that are in conflict with storm sewer placement, but the city ~hs advised ns that l,~etcalI' uonstruction must clean, ~ocate, ~i× or repair all oi' t~eir existing valves on the entire project for free. If we do not do this, ~hey will not sh~t the water oI'f .~or us to do our wor~. T~ s~.t~on is' entirely ~naccepta01eto ~s. ~etcaif I',onstr~ction does not hn.ve any responsibility to do t;r~,o mn. intenence for the Uity of ~'~oope]l's w~ter dept. ~1. I,ateral 21'~ aprox. ~ station 1~1+O0 are in conflict wl~h H" w~ter' line. AJ. A). ,ater~l .',,B aprox. ~ station 5+~5 H,, W'~t;er ,liMe I~v~nrt. n~. 5'X2' Drnn,~st Oox cuJv~rt- corox. ~ st,,',t[on 1+Z5 to station ~+OO Note: Ti%'is is to be a new change order. out and su0mit -~.t a later date . We will przce this in closing , .[et us also st,:~,te that all of the utility companies nave ~een amvisem of toe above listed conflicts and other possible conflicts. Ginn & assoc, i~ave also been made aware of these situations many t~mes by Ashlar's project superintendent Mr. Hay .~ailey . Sti.Ll no action nas 0een taken to rectify the problems. These sort of prob]c~ns b~ve existed from the very beginning oi' toe project up ~ntii toe nresent . This lack of cooperation by toe utility owners, Ginn & Assoc. and the City of Coppell has delayed this project considerab£y. Sincere.~y, Metca]1' Construction Co.~ 2011 Progressive 'Dallas, Texas 75212' Terry W. Mayo Project Estimator