Loading...
ST8501-CN 820430 CONTRACT DOCUMENTS FOR FREEPORT PARKWAY BRIDGE IN COPPELL, TEXAS THE SOUTHWESTERN TOWN LOT CORPORATION Prepared By: KYLE, JOHNSTON & ASSOCIATES, INC. Consulting Engineers Dallas, Texas 75218 APRIL, 1982 CONTRACT DOCUMENTS FOR FREEPORT PARKWAY BRIDGE IN COPPELL, TEXAS THE SOUTHWESTERN TOWN LOT CORPORATION Prepared By: KYLE, JOHNSTON & ASSOCIATES. INC. Consulting Engineers Dallas, Texas 75218 APRIL, 1982 'To: PROPOSAL , 1 982 The Southwestern Town Lot Corporation Attention: Mr. D. S. Gibson Southern Pacific Building, Room 500 One Market Plaza San Francisco, California 94105 Gentlemen: The undersigned, as bidder, declares that he has carefully examined the form of Contract, Notice to Contractors, specifications, and the plans therein referred to, and has carefully examined locations, conditions, and classes of materials of the proposed work; and agrees that he will provide all necessary supervision, labor, equipment, tools and materials called for in the contract and specifications in the manner prescribed therein and according to the require- ments of the ENGINEERas therein set forth. It is understood that the following quantities of work to be done at unit prices are approximate only, and are intended principally to serve as a guide in evaluating bids. It is agreed that the quantities of work to be done at unit prices and mat- erials to be furnished may be increased or diminished as may be considered necessary in the opinion of the ENGINEER, to complete the work fully as planned and contem- plated, and that all quantities of work, whether increased or decreased, are to be performed at the unit prices set forth below except as provided for in the specifications. The undersigned hereby proposes and agrees to perform all work of whatever nature required, in strict accordance with the plans and specifications, for the following sum prices, to wit: C-1 GATEWAY BUSINESS PARK COPPELL, TEXAS FREEPORT PARKWAY BRIDGE BID SCHEDULE CONTRACT "B" Item Qty/ No. Unit 1 16 CY Description Unclassified street excavation, complete for the sum of 2 ll6 CY dollars and cents/C.Y. Substructural concrete for three interior bents complete and in place for the sum of dollars and cents/L.F. 3 298 LF 36" diameter drill shaft for three interior bents, complete and in place for the sum of 4 9 CY 5 520 LF dollars and cents/L.F. Bell Footings, complete and in place for the sum of dolla'rs and cents/C.Y. 30" diameter drill shafts, complete and in place for the sum of 6 156 LF dollars and cents/L.F. 18" diameter drill shafts, complete and in place for the sum of dollars and cents/L.F. 7 535 CY 8" Class C reinforced concrete slab span (deck), complete and in place for the sum of dollars and cents/C.Y. PROPOSAL DATE Unit Price Total Price C-2 GATEWAY BUSINESS PARK COPPELL, TEXAS Item Qty/ No. Unit 8 94.1 CY 9 2,700 LF l0 136 CY ll 220,000 LB 12 9,757 LB 13 45 CY 14 288 LF FREEPORT PARKWAY BRIDGE BID SCHEDULE CONTRACT "B" Description Two abutments, Class C reinforced concrete, complete and in place for the sum of dollars and cents/CY 36 prestressed concrete beams (75'-0" (Type 54) in place for the sum of dollars and cents/LF Riprap concrete Class B complete and in place for the sum of dollars and cents/CY Reinforcing steel in place for the .sum of dollars and cents/LB ~" structural steel armor joint complete and in place for the sum of dollars and cents/LB Approach slabs, Class C reinforced concrete, complete and in place for. the sum of dollars and cents/CY 2" preformed compression seal at armor joints, complete and in place for the sum of dollars and cents/LF C-3 Unit Price To ta 1 Price GATEWAY BUSINESS PARK COPPELL, TEXAS .FREEPORT PARKWAY BRIDGE BID SCHEDULE CONTRACT "B" Item Qty/ No. Unit Description 15 594 LF Aluminum bridge guard rail, complete and in place for the sum of dollars and cents/LF 16 390 SY 6" reinforced concrete sidewalk complete and in place for the sum of dollars and cents/SY 17 16 EA Interior Diaphragms, complete and in place for the sum of dollars and cents/EA 18 1-6 EA End Diaphragms, complete and in place for the sum of dollars and cents/EA 19 200 LF Metal.Beam Guard Fence, complete and in place for the sum of dollars and cents/LF 20 32 EA Use of temporary casings for in- stallation of drilled shafts as specified under Item 600 of these 'specifications dollars and cents/EA 21 330 CY Cohesionless sand backfill behind abutment as specified under Item 600 of these specifications in place for the'sum of dollars and cents/CY TOTAL BRIDGE C-4 Unit Price Total Price It is understood and agreed that all work described herein will be completed within working days from the date of Notice to Proceed. It is understood that the work proposed to be done will be accepted when fully completed in accordance with the plans and specifications as determined by the Engineer. It is understood that the Owner reserves the right to reject any and all bids and to waive any informality received in the bids. The undersigned certifies that the bid prices contained in this proposal have been carefully checked and are submitted as correct and final. Receipt is hereby acknowledged of the following addenda to the plans and specifications: ADDENDUM NO. 1, dated ADDENDUM NO. 2, dated ADDENDUM NO. 3, dated ADDENDUM NO. 4, dated ADDENDUM NO. 5, dated Received Received Received Received Received Contractor By: (signature) (Titl'e) (Address) {City, State and Zip Code) Seal and Authorization (If a Corporation) (Area Code)' (Telephone Number) C-5 GATEWAY BUSINESS PARK COPPELL, TEXAS FREEPORT PARKWAY BRIDGE STATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANSPORTATION GOVERNING SPECIFICATIONS AND SPECIAL PROVISIONS All specifications and special provisions applicable to this project are identified as follows: STANDARD SPECIFICATIONS: Adopted by the State Highway Department of Texas, January 3, 1972 Item 100 Item llO Item 1 50 Item 164 Item 360 Item 400 Item 416 Item 420 Item 421 Item 432 Item 440 Item 520 Item 524 Item 600 Preparing Right of Way (102) (104) (132) Roadway Excavation (204) (211) (212) (213) Blading Seeding for Erosion Control (166) Concrete Pavement (Water cement ratio) Structural Excavation Drilled Shaft Foundations (448) Concrete Structures Concrete for Structures (420) (437) (502) (531) (4000) (360) Riprap Reinforcing Steel Concrete Curb (521) Concrete Sidewalks and Driveways Special Project.Requirements STANDARD SPECIFICATIONS: Adopted by the City of Dallas Item 450 Item 560 Aluminum Bridge Railing Metal Beam Guard Rail SPECIAL PROVISIONS: Special provisions will govern and take precedence over the specifications enumerated hereon wherever in conflict therewith. S S S S S 3ecial Provision to Item 360 3ecial Provision to Item 400 3ecial Provision to Item 416 ~ecial Provision to Item 420 )ecial Provision to Item 421 )ecial Provision to Item 440 )ecial Provision to Item 560 (360---016) (400---007) (416---009) (420---005) (421---020) (440---003) (560---004) GENERAL: The above-listed specification items are those under which payment is to be made. These, together with such other pertinent items, if any, may be referred to in the above-listed specification items, and including the special provision listed above, constitute the complete specifications for this project. SPECIAL PROVISIO~ TO ITEM 360 CONCRETE PAVEI~-2/T (Water Cement Ratio) For this project, Item 360, "Concrete Pavement (Water Cement Ratio)" of the Standard Specifications, is hereby amended with respect to the clauses cited below and no other clauses or requirements of this item are waived or changed hereby. Article 360.2. Materials, Subarticle (1) Cement, is supplemented by the follow- ins. When the cement is to be used in concrete with aggregates that may be deleteri- ously reactive, the alkali content (NaO+0.658K20) of the cement shall not exceed 0.60 percent. Article 360.2. Materials, Subarticle (3) Coarse Aggregate. The second para- graph is voided and replaced by the following. Coarse aggregate shall have a wear of not more than 45 percent when tested ac- cording to Test Method Tex-410-A, and when tested by standard laboratory ~ethods shall meet the following grading requirements: Retained on 1-3/4" sieve ....................... O~ Retained on 1-1/2" sieve ....................... 0 to Retained on 3/&" sieve ........................ , 30 to 65% Retained on 3/8" sieve ......................... 70 to Retained on No. 4 sieve ........................ 95 to 100~ Loss by Decantation Test Hethod Tex-406-A .......................... * 1.0~ Haximum * In the case of crushed aggregates, if the material finer than the No. 200 sieve consists of the dust of fracture, essentially free from clay or shales, this percentage be increased to 1.5. Article 360.2. Haterials, Subarticle (4) Fine Aggregate, Section Fine Aggregate Exclusive of Mineral Filler. The third paragraph is voided and replaced by the following. Unless specified otherwise on the plans, fine aggregate shall meet the follow- ing grading requirements: Retained on 3/8" sieve ........................ O~ Retained on No. 4 sieve ....................... 0 to Retained on No. 8 sieve ....................... 0 to 207. Retained on No. 16 sieve ...................... 15 to 50% Retained on No. 30 sieve ...................... 35 to Retained on No. 50 sieve ...................... 70 to Retained on No. 100 sieve ..................... 90 to 100% Retained on No. 200 sieve ..................... 97 to 100% 1-3 360---016 12-77 Article 360.2. H~terials, Subarticle (9) Asphalt Board. The second sen- tence is voided and replaced by the follo~ing. Asphalt board shall consist of t~o suitable asphalt-impregnated liners filled with a mastic mixture of asphalt and vegetable fiber and/or mineral fiber. Article 360.3. Equipmen.t, Subarticle (10) FtnishinR Equipment, Section (b) Longitudinal Finishing. The fourth paragraph is voided and not replaced. Article 360.6. Concrete Hixint and Placing, Subarticle (1) Hixinl Hethogs is voided and replaced by the follo~ing. (1) Hixing Hethods. The concrete shall be mixed in a mixer conforming to the requirements of Subarticle 360.3 (4) of this item. Ready-mix concrete conforming to the requirements of the Item, "Ready Nix Plants', m~y be used for mixing concrete for pavement only when specifically permitted by a note on the plans, except that ready-mix concrete may be used for curbs, irregular sections and/or small placements such as turnouts and leaveouts. Article 360.8. Spreading and Finishing, Subarticle (1) Hachine Finishing. The seventh paragraph is voided and replaced by the loll'ovAr~', After completion of the straightedge operation, as soon as construction operations permit, texture shall be applied with 1/8-inch-wide metal tines with clear spacin~ between the tines being not less than one-quarter inch nor more than one-half inch. The texture shall be applied transversely. It is the intent that the average texture depth resulting from the number of tests directed by the Engineer be not less then 0,060 inch with s mini- mum texture depth of 0.050 inch for any one test when tested in accordance with Test Hethod Tex-436-A. Should the texture depth fall belov that tended, the £inishin8 procedures shall be revised to produce the desired texture. Article 360.8. Spreading and Finishing, Subarticle (1) N~chine Finishing, Section Emergency Procedures. The first and third paragraph are voided and replaced by the following. Emergen~7 Procedures The Contractor shall have available at all times hand rakes with tines for the purpose of prorating texture in the event of equipment breakdown. After completion of texturing and about the time the concrete becomes hard, the edge of the slab and joints shall be carefully finished as directed by the Engineer, and the pavement shall be left smooth and true to line. Article 360.11. Penalty for Deficient Pavement Thickness. The first para- graph is voided and replaced by the following. The adjustment in unit prices provided for in this article will apply only when measurement for payment is by the square yard. The adjustment may be waived by a note on the plans where concrete-pavement work is narrow widen- ing or small placements. 2-3 360--- 016 12-77 Article 360.13. Payment is voided and replaced by the following. 360.13. .payment. The work performed and materials furnished as prescribed by this item and measured as provided under '~Measurement" will be paid for at the unit price bid for "Concrete Pavement" of the type and depth specified, "Concrete Pavement" of the type, reinforcement and depth specified, "Concrete Pavement (High Strength)" of the type and depth specified, "Concrete Pavement (High Strength)" of the type, reinforcement and depth specified and "Mono- lithic Curb" of the type specified (when pavement is measured by the square yard), as required, or the adjusted unit price for pavement of deficient thickness as provided under "Penalty for Deficient Pavement Thickness", which price shall be full compensation for shaping and fine-grading the roadbed, including furnishing and applying all water required; for furnishing, loading and unloading, storing, hauling and handling all concrete ingredients, in- eluding all freight and royalty involved; for placing and adjusting forms, including supporting material or preparing track grade; for mixing, placing, finishing, sawing, cleaning and sealing Joints and curing all concrete; for furnishing and. installing all reinforcing steel; for furnishing all materials for sealing Joints and placing longitudinal, expansion and weakened-plane Joints, including all steel-dowel caps and load-transmission devices required and wire and devices for placing, holding and supporting the steel bars, load- ing steel bars where required by plans and for all manipulations, labor, equipment, appliances, tools, traffic provisions and incidentals necessary to complete the work. Excavation required by this item in the preparation of the subgrade and for the completion of the shoulders and slopes viii be measured and paid for in accordance with the provisions governing the Items of "Roadway Excavation" and "Borrow", respectively, with the provision that yardage shall be measured and paid for once only, regardless of the manipulations involved; or where shown on the plans, such york will be measured and paid for in accordance with provisions governing the Item, "Binding". Measurement of subgrade excavation for payment shall be limited to a total width of that of the pavement plus one foot on each side. Payment under excavation items will not be allowed within the areas designated for "Binding". Sprinkling and rolling required for the compaction of the rough aubgrade in advance of fine-grading will be measured and paid for aa indicated in the governing items of excavation. Maintenance of a moist condition of the aubgrade in advance of fine-grading and concrete placing will not be paid for directly but shall be considered subsidiary work, as pr°Vided above. 3-3 360---016 12-77 STAq'E DI,:PART,~.I[,qNT OF IIIGIIWAYS AND PUBLIC TRANSPORTATION SPECIAL PROVISION TO ITEM 400 S TRUCTUiGtL EXCAVATION For this project the Item, "Structural Excavation" is hnreby amended %~ith respect to the clauses cited below. No other clauses or requirements of this item are waived or changed hereby. Article 400.2. Construction Methods. hereby supplemented by the following: (1) Excavation is When trench and/or negative projecting conditions for concrete pipe culvert are required by design, an excavation diagram will be shown on the plans. The limits of excavation shown shall not be exceeded. Article 400.3. Cofferdams and Caissons. The first paragraph of this Article is hereby supplemented by the following: For Southern Pacific Transportation Company and St. Louis Southwestern Railway Company structures only, where excavation requires shoring, the shoring for the excavation shall be in accordance with Part 20 of the latest edition of the AREA "Speoification for Design of Flexible Pile Bulkheads", and with Part 20-A of the "Supplemental Specification for Design of, Shoring" of the Southern Pacific Transportation Co. Shoring plans and calculations shall be approved by the Railway Company when excavation encroaches inside a line be- ginning at top of tie elevation, twelve feet from the center line of track and extending away from track on a slope of 1 to 1 for natural earth, and a slope of 1½ to 1 for embankment material. The design of the shoring or bulkheads shall be prepared by a Registered Professional Engineer experienced in the design of falsework shoring. Five sets of falsework or bulkhead plans and calculations will be required. The Registered Professional Engineer shall sign, and show his seal, o~] both the plans and calculations. 1-2 400---007 11-79 A copy of cac~ o£ the referenced design specifications are available ir~]Ti 11~, Railway Company or the State Department of Highways and P~]~lic Tra~]sportation upon request. Approval of the plans and calculations by the Department and the Railway Company will be required, prior to the beginning of excavation. Article 400.!%. Backfilling. Subarticles (1) General., and (2) Pipe Culver%s., are hereby supplemented by the following: Except for corrugated metal pipe culverts, when tamping equip- ment is furnished which, when proven to the satisfaction of the Engineer will adequately compact the backfill material to the density required, the 6" and 10" lifts (loose measurement) shown herein may be increased to heavier lifts not to exceed 12" maximum. The second paragraph of Subarticle 400.7, Payment, is hereby supplemented by the following: If no direct method of payment is provided in this contract for culvert excavation, the removal and replacement of unstable or incompressibl,~ material, when such work is authorized by the Engineer, will be measured and paid for at Fifteen Dollars, ($15.00) per cubic yard. 2-2 400---007 11-79 STATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANSPORTATION SPECIAL PROVISIONS TO ITEM 416 DRILLED SHAFT FOUNDATIONS For this project the Item, "Drilled Shaft Foundations" is hereby amended with respect to the clauses cited herein. No other clauses or requirements of this Item are waived or changed hereby. Article 416.3. Construction Methods. Subarticle (1) Excavation. The seventh sentence of the fifth paragraph of this Subarticle is hereby voided and replaced by the followings When casing is required, the outside diameter of the casing shall not be less than the specified diameter of shaft. That portion of the shaft below the casing may bo slightly smaller than the nominal diameter of ~h~ shaft, i.e., shall be the . largest size possible when drilling through s casing with the outside diameter as specified heroin~ otherwise the size of casing and size of drilled excavation will be left to the dis- cretion of the Contractor except as noted below. The tenth paragraph of this Subarticle is hereby supplemented ~y the following= When the plans indicate that skin friction design has been used, any casing used will not be permitted to remain in place unless otherwise noted on the plans or permitted by the Engineer. 1-1 416---009 3-80 STATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANSPORTATION SPECIAL PROVISION TO ITEM 420 CONCRETE STRUCTURES For this project the Item, "Concrete Structures", is hereby amended with respect to the clauses cited below. No other clauses or requirements are waived or changed hereby. Article 420.2. Materials. (2) Expansion Joint Material. (c) Aspahlt Board. The first sentence is hereby voided and replaced by the following: Asphalt board shall consist of two suitable asphalt-impregnated liners filled with a mastic mixture of asphalt and vegetable fiber and/or mineral fiber. Article 420.6. Construction Joints. The second paragraph is hereby vOided and replaced by the following: Construction joints shall be of the type and at the locations shown on the plans. Construction joints other than those shown on the plans will not be permitted in bridge slabs. Additional joints in other members will not be permitted without written authorization from the Engineer. When additional joints are authorized, they shall have details equivalent to those shown on the plans for joints in similar locations. Article 420.9. Forms. Subarticle (1) General, is hereby supplemented by the following: Studs, joists, wales or other devices used for form supports shall be of sufficient section and rigidity to withstand undue bulging or settling of the forms. Any device or method used for form support shall be subject to the approval of the Engineer. Article 420.9. Forms. Subarticle (4) Form Supports for Over- hang Slabs, is hereby voided and replaced by the following: 1-6 420---005 8-77 (4) Form Supports for Overhang Slabs. Form supports which transmit a horizontal force to a steel girder or beam, or to a prestressed concrete beam will be permitted, but shall not be used unless a structural analysis has been made of the effect on the girder or beam and approval is granted by the Engineer except as specified herein. When overhang brackets are used on prestressed concrete beam spans, with slab overhangs not exceeding 3'-6" from outside edge of top beam flange, the following shall apply: (a) For spans with Type A, B, C, III, IV or V beams, with skew angle less than 15° no bracing will be required, provided the space between in-place diaframs does not exceed 30 feet. For skews greater than 15" a No. 5 bar will be required at each corner of the span to be set perpendicular to the outside and adjacent interior beams as close to the ends of span as possible and welded to the projecting reinforcement (R-bars). (b) For Type A, B, C, III, IV or V beams with in-place diafram spacing exceeding 30 feet and all Type 48", 54", 60", 66", 72" and 54" Modified (12" web) beams, additional bracing will be required as shown in the plans. (c) For spans in which the overhang exceeds 3'-6", additional support will be required for the outside beams regardless of the type beam used. Details of the proposed support system shall be submitted by the Contractor for approval. Holes in steel members for support of overhang brackets may be punched or drilled full size or may be torch cut to one- fourth inch under size and reamed full size. In no case shall the holes be burned full size. The hole shall be left open unless specified on the plans to be filled with a button head bolt. They shall never be filled by welding. Ail welding shall be done by a qualified welder and in accor- dance with the Items, "Structural Welding". Article 420.11. Placing Concrete - General. The seventh and eighth paragraphs of this Article are hereby voided and replaced by the following: From the time of initial strike off of the concrete until finishing is completed and required interim curing is in place, 2-6 420---005 8-77 the unformed surfaces of slab concrete in bridge decks and top slabs of direct traffic culverts shall be fogged when necessary to replace water loss due to evaporation. Fogging equipment shall be capable of applying water in the form of a fine mist, not a spray. It may be water pumped under adequate high pressure, or a combination of air and water pumped under high pressure; either system in combination with a suitable atomizing nozzle. The equipment shall be sufficiently portable for use in the direction of any prevailing wind. It shall be adaptable for intermittent use as directed by the Engineer to prevent excessive wetting of the concrete. The ninth paragraph of this Article is hereby voided and replaced by the following: Interim curing will be required for slab concrete in bridge decks and top slabs of direct traffic culverts immediately upon completion of final finish. Type 1 membrane curing compound (Resin Base Only) will be required. Water curing will be re- quired in accordance with Article 420.21. Curing Concrete, and shall be commenced as soon as possible without damaging the concrete surface finish. Article 420.13. Placing Concrete in Hot Weather. This Article is hereby voided and replaced by the followingl Unless otherwise directed by the Engineer, when the temperature of the air is above 85F, an approved retarding agent will be required in all concrete used in superstructures and top slabs of direct traffic culverts. An approved retarding agent will be required in all cased drilled shafts regardless of temperature. Article 420.15. Placing Concrete in SUperstructure. The first sentence of the first paragraph is hereby voided and replaced by the following: Unless otherwise specified on the plans, simple span bridge slabs shall be placed without transverse construction joints by using either a mechanical longitudinal screed, or a self propelled transverse finishing machine. For small placements or for unusual conditions, the Engineer may waive the mechanical screed requirement and permit the use of manually operated screeding equipment. The first sentence of the second paragraph is hereby voided and replaced by the following: 3-6 420---005 8-77 Unless otherwise specified on the plans, slabs on continuous units shall be placed in one continuous operation without trans- verse construction joints using a mechanical longitudinal screed, or a self propelled transverse finishing machine. For unusual conditions, such as widening, variable cross slopes or tran- sitions, the Engineer may waive the mechanical screed requirement and permit the use of manually operated screeding equipment. This Article is further supplemented by the following: For continuous placements (slab on steel or prestressed members, continuous slab and girder units or continuous stab spans) a minimum rate of placement will be specified on the plans. For simple span units, a minimum rate of placement for a particular unit may be specified on the plans. If not so specified, the Contractor shall satisfy the Engineer that the equipment fur- nished is capable of placing, finishing and curing the slab at an acceptable rate to insure compliance with the specifications. The profile gradeline may require adjustment, due to variation in beam camber and other factors, to obtain the required cover over the slab reinforcement. Beams shall be set in a sufficient number of spans so that when adjustment is necessary the profile gradeline can be adjusted over suitable increments so that the revised gradeline will produce a smooth riding surface. Article 420.19. Treatment and Finishing of Horizontal Surfaces Except Roadway Slabs. The second paragraph of this Article is hereby voided and replaced by the following: The tops of caps and piers between bearing areas shall be sloped slightly from the center toward the edge, as directed by the Engineer, so that the water will drain from the surface, and shall be given a smooth trowel finish. Bearing areas for steel units shall be constructed in accordance with Article 441.35, Bearing and Anchorage. Bearing seat build-ups or pedestals for concrete units may be cast integrally with the cap or with a construction joint as follows: The construction joint area under the bearing shall have the surface roughened thoroughly as soon as practical after initial set is obtained. The bearing seat build-ups shall be placed using a latex based grout or an epoxy grout, mixed in accordance with the manufacturer's recommendation. Pedestals shall be placed using Class "C" concrete, rein- forced as shown on the plans. 4-6 420---005 8-77 Bearing areas under elastomeric pads shall be given a slightly textured, wood float finish. Maximum 3"- [ 'i"::~"'":' at ~_ beam. -'' "%' .SEC. THRU. CAP Pedestal Permissible Const. Jt. Article 420.20. Finish of Roadway Slabs. The seventh and eighth paragraphs of this Article are hereby voided and not replaced. The first and second sentences of the ninth paragraph of this Article are hereby voided and replaced by the following~ Unless otherwise shown on the plans, when no additional wearing course is to be placed upon the concrete slab, the surface shall be finished with adequate equipment to provide the texture speci- fied herein, with the grooves or striations of the final finish parallel to the structure centerline; however, the Engineer may authorize transverse finishing if desired. The eleventh and twelfth paragraphs of this Article are hereby voided and replaced by the following: After the concrete slab has attained its final set, the Engineer may require that the finished surface be tested with a standard 10 foot straight edge. The straight edge shall be used parallel to the centerline of the structure to bridge any depressions and touch high spots. Ordinates of the irregularities, measured from the face of the straight edge to the surface of the slab, should normally not exceed 1/8 of an inch, making proper allowances for camber, vertical curve and surface texture; however, occasional variations exceeding this will be acceptable if, in the opinion of the Engineer, it will not produce unacceptable riding qualities. 5-6 420---005 8-77 When directed by the Engineer, irregularities exceeding the above shall be corrected. Areas which are corrected to prodUce satisfactory riding qualities shall be provided with an accept- able surface texture in a manner approved by the Engineer. This Article is hereby supplemented by the following: When the plans require that an asphaltic seal is to be placed on the slab, the concrete shall be adequately leveled by screeding or other acceptable methods, and shall be given a lightly tex- tured broom finish, similar to a sidewalk finish, to provide bond for the surface treatment. The depth of striations shall not exceed approximately 1/16 inch. Straight edge requirements will not be required on slabs to be overlayed. Article 420.21. Curing Concrete. Exceptions to 4-Day Curing is hereby voided and replaced with the following: EXCEPTIONS TO 4-DAY CURING Description Required Curing Upper Surfaces of Bridge Slabs and Top Slabs of Direct Traffic 8 curing days (Type I or III cement) 10 curing days (Type II cement ) Concrete Piling (non-prestressed) 6 curing days when the air temperature is expected to drop below 40F, the concrete shall be covered with polyethylene sheeting, burlap- polyethylene blankets, mats or other acceptable materials to provide the protection required by Article 420.12. Article 420.21. Curing Concrete, (2) Water Curing, (a) Wet Mat. The first two sentences of the first paragraph are hereby voided and replaced with the following: Polyethylene sheeting or burlap-polyethylene blankets placed in direct contact with the slab will be required when the air temperature is expected to drop below 40F during the first 72 hours of the curing period. Wet mats placed in direct contact with the slab will be required when the air temperature is expected to remain above 40F for the first 72 hours of the curing period. 6-6 420---005 8-77 STATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANSPORTATION SPECIAL PROVISION TO ITEM 421 CONCRETE FOR STRUCTURES For this project the Item, "Concrete for Structures", is hereby amended with respect to the clauses cited below. No other clauses or requirements are waived or changed hereby. Article 421.2. Materials. (1) Cement. The first paragraph of this Subarticle is hereby supplemented by the following: When the cement is to be used in concrete with aggregates that may be deleteriously reactive, the alkali content (Na20+O-658K20) of the cement shall not exceed 0.60 percent. The fourth paragraph of this Subarticle is hereby voided and replaced by the following: Ail cement used in a monolithic placement shall be of the same type. Article 421.2. Materials. (3) Coarse Aggregate. The second paragraph of this Subarticle is hereby voided and replaced by the following: Unless otherwise specified on the plans, coarse aggregate will be subjected to five cycles of both the sodium sulfate and the magnesium sulfate soundness test in accordance with Test Method Tex-411-A. When the loss is greater than 12 percent with sodium sulfate and/or 18 percent with magnesium sulfate, further testing will be required prior to acceptance or rejection of the material. A satisfactory record under similar conditions of service and exposure will be considered in the evaluation of material failing to meet these requirements. The fifth paragraph of this Subarticle is hereby supplemented by the following: In the case of aggregates made primarily from the crushing of stone, if the material finer than'the 200 sieve is definitely 1-6 421---020 8-80 estnblished to be the dust of fracture, essentially free from clay or shale, as established by Part III of Test Method Tex- 406-A, the percent may be increased to 1.5. Table 1 Coarse Aggregate Gradation Chart is hereby voided and replaced by the following: Percent Retained on each Sieve Aggregate Nominal 3 2-1/2 2 1-1/2 3/4 1/2 3/8 No. No. Grade No. Size in. in. in. in. in. in. in. 4 8 1 2-1/2 in. 0 0 to 0 to 15 to 60 to 95 to 5 20 50 80 100 2 1-1/2 in. 0 0 to 30 to 70 to 95 to 5 60 90 100 3 1 in. 0 to 10 to 40 to 95 to 5 40 75 100 4 3/8 in. 0 5 to 75 to~ 30 100 5 0 0 to 45 to 90 to 95 to 10 80 100 100 Table 1 COARSE AGGREGATE GRADATION CHART Article 421.2. Materials. (4) Fine Aggregate. Table 2, Fine Aggregate Gradation Chart is hereby voided and replaced by the following ~ Percent Retained on Each Sieve Aggregate 3/8 No. No. No. No. No. No. No. Grade No.. in. 4 8 16 30 50 100 200 1 0 0 to 0 to 15 to 35 to 65 to 90 to 97 to 5 20 50 75 90 100 100 NOTE 1: Where manufactured sand is used in lieu of natural sand the percent retained on the No. 200 sieve shall be 94 to 100. NOTE 2: Where the sand equivalent value is greater than 85, the retainage on the No. 50 sieve may be 65 to 94 percent. Table 2 FINE AGGREGATE GRADATION CHART 2-6 421---020 8-80 Article 421.2. Materials. (4) Fine Aggregate. The third paragraph of this Subarticle is hereby voided and replaced by the following: Unless otherwise shown on plans, the acid insoluble residue of fine aggregate used in slab concrete subject to direct traffic shall be not less than 28 percent by weight when tested in accordance with Test Method Tex-612-J. The seventh paragraph of this Subarticle is hereby voided and replaced by the following: For Class H or H-H Concrete, the fineness modulus of the fine aggregates shall be between 2.40 and 2.90. Article 421.5. Measurement of Materials. hereby supplemented by the following: This Article is When a mobile, continuous, volumetric type mixer is used, an accurate method of measuring ingredients by volume will be required. Article 421.7. Classification and Mix Design. The first sentence of the fourth paragraph of this Article is hereby voided and replaced with the following: Trial batches will be made and tested using all the proposed ingredients prior to the placing of concrete, and when the aggre- gate, and/or type, brand or source of cement, or admixture is changed. When the brand and/or source of cement only is changed the Engineer may waive trial batches only if a prior record of satisfactory performance of the cement has been established. The seventh paragraph of this Article is hereby voided and not replaced. The first sentence of the ninth paragraph of this Article is hereby voided and replaced by the following: When a retarding admixture is required for hot weather con- creting, as specified in Article 420.13, the amount to be used will be as required in the Item, "Concrete Admixtures", subject to change by the Engineer when required. Article 421.8. Consistency. voided and not replaced. The first paragraph is hereby 3-6 421---020 8-80 Table 3 Slump Requirements is hereby voided and replaced by the following: Concrete Designation Desired Slump Max. Slump Structural Concrete (1) Cased Drilled Shafts 5 (2) Uncased Drilled Shafts, 4 Thin-Walled Sections (9" or less) (3) Slabs,Caps,Columns,Piers, 3 Wall Sections Over 9",etc. (4) Prestressed Concrete Members Class H 4 Class H-H 6 4 5 8 Underwater or Seal Concrete 5 6 Riprap,Curb, Gutter and Other Miscellaneous Concrete as specified by Engineer Note: No concrete will be permitted with slump in excess of the maximums shown. Table 3 SLUMP REQUIREMENTS Article 421.9. Quality of Concrete, General. The first second and fourth paragraphs of this Article are hereby voided and replaced by the following: The concrete shall be uniform, workable and of a consistency acceptable to the Engineer. The cement content, maximum allowable water/cement ratio, the desired and maximum slump, the proper amount of entrained air and the strength requirements for all classes of concrete shall conform to the requirements of these specifications. It shall be the responsibility of the Contractor to provide concrete meeting these requirements. During the progress of the work, the Engineer will cast test cylinders or beams, perform slump and en[rained air tests and temperature checks, as required, to insure compliance with the specifications. If the required strength or consistency of the class of concrete being produces cannot be secured with the minimum cement specified or without exceeding the maximum water/ cement ratio, the Contractor will be required to furnish different aggregates, use a water reducing agent, an air-entraining agent or furnish additional cement in order to provide concrete meeting these specifications. 4-6 421---020 8-80 Table 4 - Classes of Concrete is hereby voided and replaced by the following: Class Sx. Cement Min. Comp. Min.Beam Max.Water Coarse of per C.Y. Strength (f'c) Strength Cement Aggr. Conc. Min. 28 Day psi 7 Day psi Ratio No. --A(a) 5.0 3000 (d)500 6.5 (b)1-2- 3-4 (e) B 4.0 2000 330 8.0 2-3-4(e) C(a) 6.0 3600 (d)600 6.0 (b~-2-3 C(a)(~ 6.0 Min. 3600 (d)600 5.5 2-3 C-C 7.0 Min. 5500 N.A. 4.2 2-3 ~)(D(j Xg) (7 day-4500) D 3.0 1500 250 11.0 2-3-4(e) E 6.0 3000 500 7.0 2-3 F(a) 6 0 to As Specified f, · c 5.5 2-3 8.0 on Plans 6 ~ H(c) 6.0 to As Specified N.A. 5.5 3-5 8.0 on Plans H-H 6.0 to As Specified N.A. 4.5 3-5 (h) (g) 8.0 on Plans (a) Entrained Air (slab, pier and bent concrete). (b) Grade 1 Coarse Aggregate may be used in foundations only (except cased drilled shafts) (c) Entrained Air for slab concrete only. (d) When Type II Cement is used with Class C Concrete, the 7 day beam break requirement will be 550 psi; with Class A, 460 psi min. (e) The use of Grade 4 aggregate must have prior approval of the Engineer. (f) For bridge slabs and slabs of direct traffic culverts. (g) A high-range water reducing admixture will be required with this class of concrete. (h) When properly certified by the Materials and Tests Division this class of concrete may be used for prestressed concrete members. (j) This class of concrete may be used only when included in the contract. Table 4 CLASSES OF CONCRETE 5-6 421---020 8-80 Article 421.11. Mixing and Mixing Equipment. The fourth paragraph of this Article is hereby voided and replaced by the following: After all the required materials are in the mixer, unless otherwise specified by the Engineer the concrete shall be mixed not less than 50 seconds nor more than 90 seconds, measured from the time the last material enters the mixer to the time discharge of the concrete begins. Article 421.11. Mixing and Mixing Equipment. is hereby supplemented by the following: This Article For all miscellaneous concrete placements, including foundation placements on illumination, signing and traffic signal projects, a mobile, continuous, volumetric type mixer may be used. The mixer shall be designed to receive, store and accurately measure by volume all the concrete ingredients, including admixtures, required by the mix design in a continuous uniform rate and mix them to the required consistency before discharging. All proportioning devices and mixing systems shall be synchronized to operate simultaneously so as to produce accurately propor- tioned and thoroughly mixed concrete. Materials delivered during a revolution of the driving mechanism, or in a selected time interval, will be considered a batch and the proportion of each ingredient will be calculated in the same manner as for a batch type plant. A copy of the manufacturer's design, showing dimensions and arrangement of blades, shall be made available upon request of the Engineer. Worn blades shall be replaced with new blades in accordance with the manufacturer's design and arrangement for that particular unit. Continuous mixers shall have adequate water supply and metering devices. No water shall be added to the concrete after the initial mixing water without the permission of~ the Engineer. 6-6 421---020 8-80 STATE DEPA~T~NT OF HIGHWAYS A~ PUBLIC TRANSPORTATION SPECIAL PROVISION TO ITEM 437 CONCRETE ADMIXTURES For this project the Item, "Concrete A~ixtures", is hereby amended with respect to the clauses cited below. No other clauses or require~nents are waived or changed hereby. Article 437.2. General. by the following= This Article is hereby supplemented A "high-range water reducing admixture" is defined as a material whiqh when added to a concrete mix in the correct quantity will produce the results required in Article 437.3 herein. Article 437.3. Retarding and Water Reducing Admixtures is hereby supplemented by the following~ When required by the plans and/or specifications, or when approved for prestressed concrete members, a high-range water reducing admixture shall be used which, when compared to a standard mix design in accordance with ASTM C-494, shall produce the following results. 1. It shall reduce the required water by a min~um of 15%. 2. It shall not increase shrinkage when tested in accordance with ASTM C-494. 3. It shall increase the seven day con~ressive strength of the concrete by a n~n/m~ of 25%. 4. It shall not retard the initial set of concrete by more than one hour when tested in accordance with ASTM C-403. 5. It shall contain no chlorides, air entraining agents or urea. Article 437.5. by the following: Approval of Admixtures is hereby supplemented 1-2 437---005 3-79 Any of the following high-range water reducing admixtures may be used if they meet the requirements specified herein. FX-32, Sikament, Melment, Lomar-D, Mighty-150 or WRDA-19 Article 437.6. Construction Use of Admixtures is hereby supplemented by the following: The high-range water reducing admixture may be incorporated into the mix in either liquid or powder form. The amount to be used shall be in accordance with the manufacturer'~ recommended range, based upon adequate trial batches and as approved by the Engineer. The volume of water in the water reducer shall be taken into account in determining the water/cement ratio of the mix. The high-range water reducing admixture may be introduced into the mix entirely at the plant, a portion thereof introduced at the plant with the balance added at the job site, or all of the required amount introduced at the job site as determined by adequate trial batches, and approved by the Engineer. If during the placement of concrete, an appreciable slump loss is noted, additional high-range water reducing admixture will be required to bring the concrete back to the desired consistency. The addition of water other than that in the water reducer will not be permitted at the job sate. A retarder may be used if approved by the Engineer when the temperature of the concrete is approaching the maximum limit of 85F. When a retarding agent is required herein or by Article 420.11 or 420.13, a separate retarding agent will be ,lsed. The retarder must be compatible with any other admixtures b,~].ng used. 2-2 437---005 3-79 STATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANSPORTATION SPECIAL PROVISION ITEM 440 REINFORCING STEEL For this project the item, "Reinforcing Steel", is hereby amended with respect ot the clauses cited below. No other clauses or requirements are waived or changed hereby. Article 440.2. Materials. The first paragraph of this Article is hereby voided and replaced with the following: Unless otherwise designated on the plans, or herein, all bar reinforcement shall be deformed, and shall conform to one of the following: (1) ASTM Designation: A 615, Grades 40 or 60, open hearth, basic oxygen, or electric furnace new billet steel, or (2) ASTM Designation: A 617, Grades 40 or 60, axle-steel. When no specific grade is specified on the plans, the rein- forcing steel shall be minimum Grade 40. The second paragraph of this Article is hereby voided and not replaced. The fourth paragraph of this Article is hereby voided and replaced by the following: Spiral reinforcement shall be either smooth or deformed bars, or wire, of the minimum size or gauge shown on the plans, or as specified herein. Bars for spiral reinforcement shall comply with ASTM Designation: A675 (reference to ASTM A 29 is voided), A 615 or A 617. Wire shall be cold-drawn from rods that have been hot-rolled from billets and shall comply with ASTM Desig- nation: A 82. Unless otherwise shown on the plans the minimum yield strength for spiral reinforcement shall be 40,000 Psi. 1-4 440---003 3-80 Article 440.4. fol low lng: Tolerances is hereby voided and replaced by the 440.4. Tolerances. Fabricating tolerances for bars, from plan dimensions, shall not be greater than shown in Figure 1. Article 440.6. Splices. placed by the following: Paragraph two is hereby voided and re- Splices not provided for on the plans will be permitted, but not included for measurement, in Grade 40 bars only, sizes No. 8 and smaller, subject to the following: Splices will not be permitted in bars 30 feet or less in plan length. For bars exceeding 30 feet in plan length, the distance center to center of splices shall not be less than 30 feet minus one splice length, and no individual bar length shall be less than 10 feet. Splices which are not shown on the plans, but permitted hereby, shall be made in accordance with Table 1. The specified concrete cover shall be maintained at such splices and the bars placed in contact and securely tied together. .+ =~" Frgm end of bar t_~_o o_ny bend Spiral or Circuler Tie 1 Stirrup or Tie FIGURE I 2-4 440---003 3-80 Article 440.7. Placing. placed by the following: This article is hereby voided and re- 440.7. Placing. Unless otherwise shown~on the plans, dimensions shown for reinforcement are to the centers of the bars. Rein- forcement shall be placed as near as possible in the position shown on the plans. In the Plane of the steel parallel to the nearest surface of concrete, bars shall not vary from plan placement by more than one-twelfth of the spacing between bars. In the plane of the steel perpendicular to the nearest surface of concrete, bars shall not vary from plan placement by more than one-quarter inch. Cover of concrete to the nearest surface of steel shall meet the above requirements but shall never be less than one inch. The reinforcement shall be accurately located in the forms, and firmly held in place, before and during concrete placement, by means of bar supports, adequate in strength and number to pre- vent displacement, to keep the steel at the proper distance from the forms and to carry the reinforcing bars they support. Bars shall be supported by standard galvanized bar supports, bar supports with plastic tips, stainless steel bar supports, ap- proved plastic bar supports or approved pre-cast mortar or concrete blocks. For approval of plastic bar supports, representative samples of the plastic shall show no visible indications of deterioration after immersion in a five percent solution of sodium hydroxide for 120 hours. Mortar or concrete blocks shall be cast to uniform dimensions with adequate bearing area. A suitable tie wire shall be provided in each block for anchoring to the steel. They shall be accurately cast to the thickness required in molds approved by the Engineer. The'surface placed adjacent to the form shall be a true plane, free of surface imperfections. The blocks shall be cured by covering with wet burlap or mats for a period of 72 hours. Mortar for blocks shall contain approximately one part cement to three parts sand. Concrete for blocks shall contain nine sacks of cement per cubic yards. Individual bar supports shall be placed in rows at four foot maxi- mum spacing in each direction. Continuous type bar supports shall be placed at four feet maximum spacing. Ail reinforcing steel shall be tied at all intersections, except that where spacing is less than one foot in each direction, alter- nate intersections only need be tied. Mats of wire fabric shal.1 overlap each other one full space minimum to maintain a uniform strength and shall be fastened securely at the ends and edges. 3-4 ~ 440---003 3-80 Before any concrete is placed, all mortar, mud, dirt, etc. shall be cleaned from the reinforcement. No concrete shall be deposited until the Engineer has inspected the placement of the reinforcing steel and given permission to proceed. If the reinforcement is not adequately supported or tied to resist settlement, floating upward, overturning of truss bars, or move- ment in any direction during concrete placement, permission to con- tinue concrete placement will be withheld until corrective measures are taken. Sufficient measurements shall be made during concrete placement to insure compliance with the first paragraph of this Article. 4-4 440---003 3-80 TEXAS HIGHWAY DEPARTMF/qT SPECIAL PROVISION TO ITEM 442 METAL FOR STRUCTURES For this project, Item 442, "Metal For Structures" is hereby amended with respect to the clauses cited below. No other clauses or requirements are waived or changed hereby. Article 442.3. Structural Steel. (1) Steel For Main Members is hereby voided and replaced with the following: Article 442.3. Structural Steel. (1) Steel For Main Members. Unless otherwise shown on the plans, structural steels listed herein shall conform to the longitudinal Charpy V-notch require- ments of Group 1 in accordance with Table A. Sampling and testing shall be in accordance with ASTM A673. The (H) frequency of heat testing shall be used for all material except that (P) frequency shall be used for ASTM A514-517 steels. (a) Carbon Steel. When shown on the plans and in the pro- posal as Structural Steel-HYC, the material shall conform to the requirements of ASTM Designation: A36. (b) High Strength Steel (HS). High strength steel will be specified on the plans by minimum required yield strength (Exam- ple - HS-42, 42,000 psi minimum yield) and will be tabulated on the plans and in the proposal as Structural Steel-HS. When so specified, the steel shall conform to one of the fol- lowing ASTM Steels subject to thickness and physical requirements of the pertinent ASTM Specification: 1. ASTM Designation: A441,High-Strength Manganese Vanadium Steel. Low-Alloy Structural 2. ASTM Designation: A572, High-Strength Low-Alloy Columbium- Vanadium Steels of Structural Quality, maximum Grade 50. For 1-4 442---009 3-79 welded structures the material will be limited to shapes in ASTM Groups 1, 2 and 3; plates and bars limited to a maximum thickness of 2 inches. For mechanically fastened structures, plates and bars will be limited to a maximum thickness of 4 inches. 3. ASTM Designation: A588, High-Strength Low-Alloy Struc- tural Steel With 50,000 psi Minimum Yield Point To 4 Inch Thickness. (c) Extra High Strength Steel (XHS). Extra high strength steel will be specified on the plans by minimum required yield strength (Example-XHS-90, 90,000 psi minimum yield) and will be tabulated on the plans and in the proposal as Structural Steel - XHS. When so specified, the steel shall conform to the following: 1. ASTM Designation: A514, High-Yield Strength, Quenched and Tempered Alloy Steel Plate. The steel furnished shall be suitable for welding. Structural shapes and seamless tubing, meeting the other requirements of A514 steels, will be permitted with a maximum tensile strength of 140,000 psi for structural shapes and 145,000 psi for seamless tubing.. 2. ASTM Designation: A517, Pressure Vessel Plates, Alloy Steel, High-Strength, Quenched and Tempered. (d) High Strength Steel for Riveted or Bolted Construction(HSR). High strength steel for riveted or bolted construction will be specified on the plans by minimum required yield strength (Example - HSR-65, 65,000 psi minimum yield) and will be tabulated on the plans and in the proposal as Structural Steel-HSR. When so specified, the steel furnished shall~meet the require- ments of ASTM Designation: A242, A440, A441, A572, A588, A514 or A517 subject to thickness and stress requirements of the pertinent ASTM Specification and of the plans. Other ASTM Types and grades may be permitted when specified on the plans. When used for bolted or riveted construction (no welding required), impact requirements will be in accordance with T~ble A. 2-4 442---009 3-79 Article 442.3. Structural Steel. Subarticle (2) Miscellaneous Steel. (a) is hereby voided and replaced by the following: (a) Unless otherwise shown on the plan~ structural steel for members such as shoes, diaframs, stiffeners (including bearing stiffeners), lateral bracing, diagonals, armor joints and finger joints shall conform to ASTM Designation: A36 or AS00, Grade B. Structural steels used for secondary or nonstress-carrying members will not be subject to impact requirements. Ail steels greater than 1/2 inch in thickness used for struc- tural supports for highway signs, luminaires and traffic signals shall conform to the longitudinal Charpy V-notch requirements of Group 1 in accordance with Table A. Materiel Thickness- G~oup 1 G~oup 2 Gzoup 3 Inches See Notes See Notes See Notes A-441 a~ A-242 ~chanieaily 15 ft. ih. 15 ft. Xb. 'X5 ft. lb. fa~ten~ at A-58B* Up to 2" X5 ft. Xb. X5 ft. Xb. X5 ~t. ~b., Weld~ ~er 2' t'o 20 ft. lb. 20 rtz lb. 20 ft. Ab. 4" weXd~ Up to 4" mechanically 25 ~t. lb. 25 ft. lb. 25 ~. ~b. fasten~ at 30F at 0 r at -30F A-5~4- Up to ~" 2S ~t. lb. 2S ft. lb'~ 2g ft.' lb. 517 weld~ ~er ~" to 35 ~t. lb. 35 ft. lb. 35 ft. lb. 4" weld~ at 30F at 0 F at -30F Notes: Group 1: Minimum Service Temperature O F and above. Group 2: Minimum Service Te~nperature from -IF to -30F. Group 3: Minimum Service Temperature from -31F to -6OF. *If the yield point of the material exceeds 65 ?si, the temperature for the CVN value for acceptability shall be reduced by 150 F for each in- crement of 10 ksi above 65 ksi. TABLE A LONGZ'I~/DXNAL C~IARI~f V-NOTCH R~OUXREtqENTS 3-4 442---009 3-79 Article 442.15. Steel Deep Beam Rail. This Article is hereby voided and replaced by the following: The rail element shall be either 10 gage (0.1345 inches nominal thickness) or 12 gage (0.1046 inches nominal thickness), exclusive of protective coating, as required by the plans. Rail element shall meet all requirements of AASHTO M-180 except as modified on the plans. The terminal connector shall be of the same material, but shall not be less than 10 gage. Unless otherwise noted on the plans the rail element shall be galvanized. 4-4 442---009 3-79 CITY OF DALLAS STANDARD SPECIFICATION TO ITEM 450 ALUMINUM BRIDGE RAILING The railing shall be of the type indicated on the plans and of the particular aluminum alloy specified or indicated on the plans. Cast rail posts and rail members shall conform to the following A.S.T.M. Designation and alloy numbers unless otherwise indicated or specified: Material A.S.T.M. Alloy Tubing B 235 Sand Castings B 26 Permanent Mold Castings B 108 Shims B 209 6061-T6 or 6062-T6 SG7OA-T6 or GIOA-T4 SG7OA-T6 1100-0 For castings using alloy SG7OA-T6, the iron content shall not be in excess of 0.2 per cent. The elongation in 2 inches shall not be less than 10 per cent. To facilitate bending or straightening, aluminum materials other than castings may be heated to a temperature not exceeding 400o F. for a period not exceeding 30 minutes. Welding of aluminum materials shall be done by an inert gas shielded, electric arc welding process in which no welding flux is used. Torch or flame cutting of aluminum will not permitted. After the pipe has been formed to the required section, it shall be cut to the lengths required. The end cuts and notches shall be made at such angles with the axis of the pipe required to produce vertical end faces and plumb posts when required by the plans. Cutting and notching of pipe shall be done with a saw or other means that will insure a neat and workmanlike finish. Where the pipe rail and posts must be shop fabricated into panels, these shall be constructed while mounted in a suitable jig. As each rail section is completely assembled and connected, the next succeeding section shall be set in its proper relative position with the ends engaged, and shall remain, in this position until completely connected. The two sections then shall be match marked so that they may be erected in the same order in which they were fabri- cated. Castings may be either sand castings or permanent mold castings. The castings shall be of uniform quality and condition, free from cracks, and shall not contain defects such as blow holes, porosity, hard spots, or shrinkage effects which due to'the degree or extent, will materially affect the suitability of the casting for its intended use. The castings shall be free of all burrs, fins, discolorations, and mold marks. The finished cast- ings shall have a smooth and uniform appearance and texture, Aluminum cast- ings shall not be repaired by plugging, welding or other methods. 1-2 ALUMINUM BRIDGE RAILING: (Continued) Bolts and nuts for anchoring the railing to the structure shall be either cadmium plated steel or aluminum alloy as shown on the plans. All other bolts shall be aluminum alloy. If cadmium plated bolts are required the folts shall conform to A.S.T.M. Designation A 307, and the aluminum bolts shall be alloy 2024-T4 with alumilite finish or equal, and shall be made form rod conforming to A.S.T.M. Designation B 211. Nuts for aluminum bolts shall be aluminum alloy 6061-T6 made from rod conforming to A.S.T.M. Designation B 211. 2-2 CITY OF DALLAS STANDARD SPECIFICATION TO ITEM 560 METAL BEAM GUARD RAIL The rail elements shall be of the deep beam type fabricated to develop continuous beam strength and shall consist of metal plate or sheet formed into a beam not less than 12 inches wide and 3 inches deep as shown on the plans and details. The beam shall be free from warp. When tested with a straightedge or string along either edge of a 12½ foot sectional length of beam, the maximum deviation of the beam edges from the straight line shall not exceed one-half inch at any point. Aluminum rail elements shall have a nominal thickness of 0.156 inches minimum, and steel rail elements shall no be less tha 10 gage, and the terminal section of steel rail shall not be less than 10 gage. Where aluminum rail is used, the plate or sheet shall be of nominal thickness above specified, with variations in thickness no exceeding those as outlined in A.S.T.M. Designation B 209. Where steel rail is used, the plate or sheet shall be the United States Standard Gage. The rail shall be either aluminum, painted steel, or galvanized steel as shown on the plans, and shall conform to the following requirements. (A) Aluminum Rail The rail element shall be aluminum alloy, Alloy Alclad 2024, temper T3 conforming to A.S.T.M. Designation B 209. The terminal sections shall be aluminum alloy Alloy Alclad 2024, tem- per T42 conforming to A.S.T.M. Designation B 209. (B) Painted Steel Rail The rail element and terminal section shall be formed from open-hear~h or electric-furnace steel conforming to the requirements of A.S.T.M. Designation A 245, Grade C or A.S.T.M. Designation A 7. The railing shall receive I shop coat of red lead paint and 2 field coats of aluminum paint in accordance with the requirements of Section S 8, "Paint and Painting". (C) Galvanized Steel Rail The rail element and terminal section shall be formed from open-hearth or electric-furnace steel conforming to the requirements of A.S.T.M. Designation A 245, Grade C or A.S.T.M. Designation A 7. The rail element and the terminal section shall have a galvanized coat- ing of not less than 2½ ounces per square foot of exposed surface. The rail may be galvanized before or after fabrication and shall conform to the requirements of A.S.T.M. Designation A 123 or A.S.T.M. Designation A 93, whichever is applicable. (D) Fittings All bolts and nuts used with aluminum rail shall be as follows. Bolts shall be aluminum alloy 2024-T4 with Alumilite finish or equal, and shall be made from rod conforming to A.S.T.M. Designation B 211. Nuts shall be aluminum alloy 6061-T6 made from rod conforming to A.S.T.M. Designation B 211. METAL BEAM GUARD RAIL: (Continued) All bolts and nuts used with painted or galvanized steel rail shall be made by either the open-hearth or electric-furnace process and shall have proper shrength for the purpose intended. They shall be hot-dip galvanized to conform to A.S.T.M. Designation A 153. 2-2 ITEM 600 SPECIAL PROJECT CONSIDERATIONS BID PROPOSAL: The Contractor shall fill in the number of days for completion of the Project in the appropriate blank left on sheet C-5 of the Bid Proposal. The Contractor should set forth the time that he feels is reasonable and proper to complete the Project considering average climatic conditions. TEMPORARY CASINGS: Groundwater seepage may be encountered during installation of the drilled shafts. The use of temporary casing will then be.necessary to properly install shafts which do experience groundwater seepage. The casing shall be seated in the shale with all water and most loose material removed prior to beginning the design penetration. Care will be taken to insure a sufficient head of plastic concrete is maintained during extraction to completely fill all voids. Complete installation of individual shafts shall be accomplished in one days operation and concrete placement should proceed within eight hours of acheivin§ design penetration. These temporary casings will be paid for on a lump sum basis for each drilled shaft affected. ABUTMENT WALLS: The Contractor shall furnish and install a free draining cohesionless sand backfill behind the abutment walls with either weep holes and/or drains to prevent hydrostatic pressures from developing behind the walls. The volume to be paid for shall not exceed two feet at the base and a wedge from that point at a slope of l:l. The material shall be uniformly compacted to approximately 90 percent of ASTMD-6gS. Over compaction is not' desired as it will increase the lateral pressures. The sand will be paid for by the cubic yard in place, as provided for in the Bid Proposal. PREFORMED COMPRESSION SEAL AND LUBRICANT-ADHESIVE The preformed compression seals shall be of the open-cell compression type for sealing joints in concrete decks of brid§es. The seals shall comply with the sketches as shown on the plans. 1. MATERIALS The seal shall conform to the requirements of ASTM D 2628-69 except compression set requirements will not apply. 2. IDENTIFICATION MARKING The seals shall be marked with the name, or a suitable trademark of the manufacturer, date of production, and lot number, at intervals of not more than 4 feet. It will not be required to date the material if the lot number certification shows the date of manufacturing. On the top surface of the seals, a mark shall be placed at every 1 foot interval, sufficiently clear and durable to enable making length measurements on each seal after installtion. Field marking of the one foot intervals on the top of the seal will be permitted. 1-1 o e REQUIREMENTS FOR LUBRICANT-ADHESIVE The lubricant-adhesive shall be used as received from the manufacturer with no dilution. The lubricant-adhesive shall be delivered in containers plainly marked with the manufacturer's name or trademark, lot number and date of manufacture. The material shall be protected during storage as recommended by the manufacturer. Partially used containers shall be resealed immediately after use to prevent deterioration of the material and any deteriorated material shall be discarded without any attempt to retemper for further use. The lubricant-adhesive shall conform to the following requirements: The adhesiCe shall be a one-part, moisture curing polyurethane and aromatichydrocarbon solvent mixture with the following physical properties: Average weight per gallon Solids Content The adhesive shall remain fluid from Film Strength (ASTM D 412) Elongation 800 lbs ± 10% 65% by wt. min. 5°F to 120°F 1200 psi. min. 250% min. Material shall have a shelf life of at least one year. SAMPLING The Owner reserves the right to sample and test joint seals and lubricant- adhesive materials at any time prior to or after delivery. When required by the Engineer, the Contractor shall furnish, without charge, a test sample of the seal for each date of manufacture. A total of 3 linear feet shall be required for testing on one lot, with no individual test specimen less than one foot. A 1-pint sample from each lot of lubricant-adhesive shall be furnished upon request fo the Engineer. CERTIFICATION AND ACCEPTANCE The Contractor shall furnish manufacturer's certifications in triplicate for each day's production represented, shOwing results of tests for the material supplied and certifying that it meets all the requirements specified. Manufacturer's certifications for lubricant-adhesive shall attest that the material conforms to the above specification. The acceptance of the preformed-elastomeric joint seal shall be based upon the manufacturer's certification indicating conformance to the test requirements and'upon the results of such tests and Engineer may desire to make, providing the material conforms to thickness requirements shown on plans and the cellular arrangement is such that it will resist rotation of the top edges of seal. PAINTING When the bridge superstructure is concrete the structural steel for the expansion device and curb Plates shall be cleaned and painted in the shop in accordance with Sec. 1045.15 of the Standard Specifications, using System C prime coat, and providea minimum dry film thickness of 5 mils. Cleaning, appliCation, and touchup shall be' in accordance with Sec. 712.12. In lieu of painting, the Contractor may, if he prefers, galvanize this' material in accordance with ASTM A-123. Field painting will not be required. 1-2 e When any of the superstructure is steel, the shop and field paint shall be in accordance with the specified paint system for the structural steel. INSTALLATION PROCEDURES The compression seal shall be installed in joints in one continuous piece without field splices. Factory splicing will be permitted where individual joints are in excess of 53 feet, including sample section. The seal shall be placed so that at maximum bridge expansion its top edge is a minimum of 1/4 inch below the ridil~g surface. Twistings, curling and nicking of seals is prohibited. The lubricant-adhesive shall be applied in a continuous film to the sides of the seal and to the joint surfaces just prior to seal being placed in the joint. The seal shall.be installed using a seal installation machine as recommended by the manufacturer, that insures against the seal being in tensiun in the joint. Unless a piece of equipment can install seal without elongation, the seal shall be pre-cut to exact lengths of joint (plus ends if needed) for each joint prior to placement. The seal shall then be installed and measured for stretch. Anything over 5 percent in stretch shall be rejected and the seal removed and reinstalled. Any lubricant-adhesive in the "V" on the top of the installed seal shall be removed before it dries. 8. METHOD OF MEASUREMENT The length of prefor~ed compression Joint seal in place, including structural steel and shop painting, shall be measured between roadway faces of curbs or median and curb to the nearest linear foot of joint seal along centerline of the joint. No measurement will be made of portions of the joint which extend past the roadway face of curbs or median, or for the curb plates. BASIS OF PAYMENT Preformed compression joint seal will be paid for at the contract unit bid price per linear foot for each size in place. No direct payment will be made for structural steel, shop painting, compression seal, all materials, tools, equipment, labor or any other work and incidentals necessary to complete the item. 1-3