ST8502-CS 860514GINN, INC.
May 14, 1986
CONSULTING ENGINEERS
Mr. Ed Powell, P.E.
City Engineer, City of Coppell
Post Office Box 478
Coppell, Texas 75019
Re: Moore Road Improvements
Dear Mr. Powell:
Please find enclosed Ashlar Contracting Company's cost proposal for the
6" waterline extension on Carter Drive which Mr. Steve Goram and yourself
requested.
We do not recommend this work be done at this time by Ashlar Contracting
Company. The cost of this work is very high for this type of construction.
We will try to obtain an additional cost estimate from Haukous Construction
Company, and will notify you of the new estimate when available.
Please call if you should have amy questions.
Sincerely,
Kevin Peiffer
KP/jc
Enclosure
cc:
Steve Goram
Randy Fleming
Rueben Martinez
Wayne Ginn
16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611
BOX 713
LEWISVILLE, TEXAS 75067
214/436-5509
May 9, 1986
Ginn, Inc.
16135 Preston Rd. 106
Dallas, Tx. 75248
Attn: Kevin Peiffer
Re: Moore Road/6" Waterline Extension
Gentlemen;
Per your request by letter dated April 25, 1986, I have
prepared the costs for the subject waterline extension, which
follows:
1. 6" DR-14 CL 200 Water Pipe 60 L.F. @ $60.00:$3,600.00
2. Connect t'o existing 6" Water Pipe 1 ea.~$720.00:720.00
3. 12"x6" Tapping Sleeve & Valve 1 ea ~ $3,100.00:3100.00
4. 6" Gate Valve 1 each @ $400.00 : 400.00
$7,820.0~
Please advise this office at your earliest convieniance
if this proposal is accepted.
Sincerely
Ashlar Contracting Company
George D. Miller
Vice President
c.c File
Dan Mill