Loading...
ST8502-CS 860425 (2)GINN, INC. April 25, 1986 CONSULTING ENGINEERS Mr. George Miller Ashlar Contracting Co. P.O. Box 713 Lewisivlle, TX 75067 Re:Ca~e 6"~nsion CMoore Road Improvement Projec%~ Dear Mr. Miller: Per the City's direction, please submit to our office a unit price to extend the existing 6" waterline on Carter Drive east across Moore Road (60± LF) and tie into the existing 12" waterline. Also submit a unit price to install complete-in- place a 6" gate valve on this waterline extension. The gate valve quoted and installed shall conform to Section 07500, Part 582.2 B, paragraph 4, page 36, Ga~e Valves, of the contract specifications. The waterline unit price should reflect the cost per linear foot to install, complete-in-place, 6" PVC (blue pipe) DR-14, Class 200 pipe with a minimum 48" cover. Said unit price shall also be sufficient compensation for any installing or removing of thrust blocking, all fittings, labor, tools, equipment, testing, disinfecting, and incidentals required for the installation of this waterline. Installation shall conform to the City of Coppell standard construction detail sheet no. SD-16. An open cut trench one half the roadway width at a time across Moore Road will be allowed if proper barricades, flagmen, etc., are provided per the Texas Uniform Traffic Control Manual. During the evenings or weekends, two-way traffic must be maintained. Enclosed is a plan showing the location of the proposed 6" waterline extension and 6" gate valve. Please call if you have any questions. Sincerely, Kevin Peiffer /st Enclosure cc: Ed Powell Steve Goram Wayne Ginn Reuben Martinez Randy Fleming 16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611