ST8401-CS 880823'///~ The City With A Beautiful Future
P,O. Box 478
Coppell, Texas 75019
214 - 462 - 0022
August 23, 1988
Mr. Bobby Harrell
Terra Co.
5944 Luther Ln.
Sk~te 502
Dallas, Texas 75225
RE: MacArthur Blvd. Final Acceptance
Dear Mr. Harrell:
A final inspection was conducted on August 18, 1988 for the above referenced
project by representatives of the City of Coppell. All items to the project
are in compliance with the standards set forth by the City of Coppell
subdivision requirements and are found to be acceptable. As-built drawings
and one-year maintenance bonds have been received from both parties with
a maturity date of August 18, 1989.
Sincerely,
chie~ o~ g~a ~velo~nt
S~/bb
cc: Alan Ratliff
Dorothy Timmons
Russell Doyle
Steve Goram
Nathan D. Maier
Jensen Construction Co.
APAC-Texas, Inc.