Loading...
ST8401-CS 880823'///~ The City With A Beautiful Future P,O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 August 23, 1988 Mr. Bobby Harrell Terra Co. 5944 Luther Ln. Sk~te 502 Dallas, Texas 75225 RE: MacArthur Blvd. Final Acceptance Dear Mr. Harrell: A final inspection was conducted on August 18, 1988 for the above referenced project by representatives of the City of Coppell. All items to the project are in compliance with the standards set forth by the City of Coppell subdivision requirements and are found to be acceptable. As-built drawings and one-year maintenance bonds have been received from both parties with a maturity date of August 18, 1989. Sincerely, chie~ o~ g~a ~velo~nt S~/bb cc: Alan Ratliff Dorothy Timmons Russell Doyle Steve Goram Nathan D. Maier Jensen Construction Co. APAC-Texas, Inc.