Loading...
ST8502-CS 860319GINN, INC. March 19, 1986 CONSULTING ENGINEERS Mr. Ed Powell, City Engineer P.O. Box 478 Coppell Realignment Enclosed please find a copy of the detailed estimate as submitted by St. Louis Southwestern Railway Company to cover the above referenced crossing. The improvements planned shall consist of a rubberized crossing with warning flasher lights and gates. The total cost of these improvements is $136,414.00. We have reviewed this estimate and recommend approval by the City of Coppell. We respectfully request that you place this item on the next available Council agenda for their consideration. Please call if you have any questions. Sincerely, Kevin Peiffer /sr Enclosure cc: Mayor Lou Duggan Frank Proctor Wayne Ginn i~I~ Prc-'.m R,~ad" Suffe i~ · DalM-. Tc×a> 7524S · Phcmc 2!-1 386-6611 COST ESTIMATE TO RELOCATE 182 FEET 16-INCH LINE F TO ACCOMMODATE MOORE ROAD IMPROVEMENTS COPPELL, DALLAS COUNTY, TEXAS March 10, 1986 Material 182 Ft. 16" O.D., 47.17#, .281" Wall, Grade X-42 Coated & Wrapped Line Pipe 4 Rolls Tapecoating 1 Gallon Primer 14 Ea. 16" 45° Weld Eli - Std. Wt. 5 Ea. 16" 90° Weld Ell - Std. Wt. Miscellaneous Sales Tax Total Material Construction Company Labor Automotive Equipment Tool & Work Equipment Contracts Miscellaneous Total Construction Indirects Stores Expense (5.327% of Material) Insurance & Texas (26.54% of Company Labor) General Overheads (11.427% of Ail) Gas Loss Total Indirects Total Project Estimate $ 4,160 152 35 1,638 770 337 432 $ 7,524 $ 4,500 2,200 6,700 7,800 1,100 $22,300 $ 4OO 1,194 3,590 3,200 $ 8,384 $38,208