ST8502-CS 860319GINN, INC.
March 19, 1986
CONSULTING ENGINEERS
Mr. Ed Powell, City Engineer
P.O. Box 478
Coppell
Realignment
Enclosed please find a copy of the detailed estimate as
submitted by St. Louis Southwestern Railway Company to cover
the above referenced crossing.
The improvements planned shall consist of a rubberized
crossing with warning flasher lights and gates. The total
cost of these improvements is $136,414.00.
We have reviewed this estimate and recommend approval by the
City of Coppell.
We respectfully request that you place this item on the next
available Council agenda for their consideration.
Please call if you have any questions.
Sincerely,
Kevin Peiffer
/sr
Enclosure
cc:
Mayor Lou Duggan
Frank Proctor
Wayne Ginn
i~I~ Prc-'.m R,~ad" Suffe i~ · DalM-. Tc×a> 7524S · Phcmc 2!-1 386-6611
COST ESTIMATE TO RELOCATE 182 FEET
16-INCH LINE F TO ACCOMMODATE
MOORE ROAD IMPROVEMENTS
COPPELL, DALLAS COUNTY, TEXAS
March 10, 1986
Material
182 Ft. 16" O.D., 47.17#, .281" Wall, Grade X-42
Coated & Wrapped Line Pipe
4 Rolls Tapecoating
1 Gallon Primer
14 Ea. 16" 45° Weld Eli - Std. Wt.
5 Ea. 16" 90° Weld Ell - Std. Wt.
Miscellaneous
Sales Tax
Total Material
Construction
Company Labor
Automotive Equipment
Tool & Work Equipment
Contracts
Miscellaneous
Total Construction
Indirects
Stores Expense (5.327% of Material)
Insurance & Texas (26.54% of Company Labor)
General Overheads (11.427% of Ail)
Gas Loss
Total Indirects
Total Project Estimate
$ 4,160
152
35
1,638
770
337
432
$ 7,524
$ 4,500
2,200
6,700
7,800
1,100
$22,300
$ 4OO
1,194
3,590
3,200
$ 8,384
$38,208