Loading...
ST8502-CS 860211GINN, INC. February 11, 1986 CONSULTING ENGINEERS Mr. George Miller Ashlar Contracting Co. P.O. Box 713 Lewisville, TX 75067 Re:<,~-~e~,<~ Road Improvements Dear Mr.'~!er: On a number of occasions, Ginn, Inc. has requested that you provide us with elevations of the existing 16" high pre~sure gas line on Moore Road at the following locations: Centerline Sta. 9 + 30(~) alley Centerline Sta. 6 + 15(~) alley Christi Lane This information was requested at the December 17, 1985 preconstruction conference, at a meeting on January 29, 1986,- and on other occasions either by telephone or in the field by the inspector. Your obligation to verify existing utilities is required per the Contract Documents. As stated at'the preconstruction conference, the purpose of your providing this data was to enable the City of-Coppell and Lone Star Gas Company to negotiate line lowerings, etc. The reason this was requested even before construction began was to allow time for negotiations without causing any delays to your construction progress. For the record, you have been informed several times of possible delays that could result if we do not receive this information as soon as possible. If you have any questions, please call. Sincerely, Kevin Peiffer /sr cc: Ed Powell Bill Bettis David Cromer Randy Fleming Wayne Ginn 16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611