ST8502-CS 860203 (2)GINN, INC. February 3, 1986 CONSULTING ENGINEERS Mr. George Miller Ashlar Contracting Company P.O. Box 713 Lewisville, TX 75067 Re: Moore Road Improvements Dear Mr. Miller: A meeting was held on January 29, 1986, as a result of recent issues that have developed on the above referenced project. Mr. Dan Mills, General Superintendent, George Miller, Randy Fleming, and Kevin Peiffer attended this meeting. This letter is documentation as to what was discussed and agreed upon at that meeting. The major issues were: 1. Poor response to repairing existing water service cut during construction. 2. Sheepsfoot roller blatantly using existing pavement, thus causing rapid deterioration to the present riding surface. 3. Inspector's job trailer being used by prime and subcontractors. 4. General Superintendent not on site at all times during construction. 5. Communication between subcontractors and Ginn, Inc. 6. Provide emergency phone numbers. Ginn, Inc.'s position and the agreements reached at this meeting on these issues are summarized as follows: Items (1) and (4): Both are basically related to the fact that Ashlar did not have a General Superintendent on the job. at all times during construction. This is required per the Contract Specifications and will be complied to. In the future, no work shall be performed by the prime or subcontractors unless the General Superintendent is present on the site. This will resolve incidences in the future like that which occurred on Item (1). 16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611 Item (2)= We do not want to see this incident occur again. Use the construction equipment for the purpose it is intended f~ It is Ashlar's responsibility to maintain two lanes of pavement at all times during construction. Therefore, after construction of the temporary asphalt detours, please patch all holes in the existing pavement with asphalt that are west of the existing Moore Road centerline. Item (3): Prime and subcontractors have no business using the inspector's job trailer. Please furnish a separate job trailer for your own personnel. This item was set up in the contract as such and payment can only be made for it if the contract is complied with. Also, provide new lock and key on inspector's trailer. Item (5): All communication must come through Ashlar. Please tell all suppliers, subcontractors, etc., to follow that procedure. Item (6): The following emergency phone numbers have been provided and will be distributed to the Coppell City Manager, City Engineer, and Police and Fire Chiefs. George Miller, Ashlar Vice President Dan Mills, Ashlar General Superintendent 361-5273 (home) 957-5206 (mobile) 393-0464 (home) Please notify our office immediately if these telephone numbers are incorrect. Mr. Miller, please realize that we felt we had a constructive meeting and were pleased with Ashlar's attitude toward responding immediately on these issues. As the project progresses, we feel that the communication and cooperation of all parties involved will continue to improve, thus providing everyone with a project that we all can be proud of. Your cooperation is appreciated. Sincerely, Kevin Peiffer /st cc: Mayor Lou Duggan Frank Proctor Ed Powell Wayne Ginn Randy Fleming