ST8401-CS 880203P.O. Box 478
Coppell, Texas 75019
214 - 462 - 0022
Febrary 3, 1988
Terra Companies
5944 Luther Lane
Suite 502
Dallas, Texas 75225
RE: Inspection Fee- MacArthur Boulevard
Mr. Harrell:
Based on construction costs submitted by Nathan D. Maier
Consulting Engineers, the inspection fee is still 'outstanding.
The inspection fee is based on 1.5% of construction cost
($1,007,450.00). The inspection fee is $15,111.75. This is
due upon receipt of this letter.
Thank you,
Steven M. Morton
Development Inspections
SMM/sm
TERRA CORPOR.~,TE JOINT VENTURE 2 8 3
TWO LINCOLN CENTRE (214) 934-9444
5420 LBJ FREEWAY, SUITE 1370
DALLAS, TX 75240
3-8
Insp. Fee-MacArthu]!lS~ti
Insp. Fee-Rivercha e8,291,3
PAY TO THE
ORDER OF City of Coppell'"
Twenty Three Thousand & Four'Hundred and~e~0 ~OLLARs