Loading...
ST8401-CS 880203P.O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 Febrary 3, 1988 Terra Companies 5944 Luther Lane Suite 502 Dallas, Texas 75225 RE: Inspection Fee- MacArthur Boulevard Mr. Harrell: Based on construction costs submitted by Nathan D. Maier Consulting Engineers, the inspection fee is still 'outstanding. The inspection fee is based on 1.5% of construction cost ($1,007,450.00). The inspection fee is $15,111.75. This is due upon receipt of this letter. Thank you, Steven M. Morton Development Inspections SMM/sm TERRA CORPOR.~,TE JOINT VENTURE 2 8 3 TWO LINCOLN CENTRE (214) 934-9444 5420 LBJ FREEWAY, SUITE 1370 DALLAS, TX 75240 3-8 Insp. Fee-MacArthu]!lS~ti Insp. Fee-Rivercha e8,291,3 PAY TO THE ORDER OF City of Coppell'" Twenty Three Thousand & Four'Hundred and~e~0 ~OLLARs