Loading...
ST8502-CS 860116 (2)GINN, INC. CONSULTING ENGINEERS January 16, 1986 Mr. Frank Proctor, City Manager P.O. Box 478 Coppell, TX 75019 Attn: Ed Powell, City Engineer Dear Mr. Powell: As you may know, during the next 10 months, Moore Road construction will create minor inconveniences for the Coppell residents who use this road daily. To help keep these inconveniences to a minimum, we have already proceeded in improving the traffic signal red/green sequence at the Moore Road/Belt Line Road intersection. During the construction, Moore Road will be given a longer green time than Belt Line Road. This modification should improve the left-turn traffic flow from Moore to Belt Line, which should particularly help traffic in the morning hours. As the construction progresses, our staff will continually monitor the impact of construction on the local traffic and make other modifications as needed to help better serve the residents in Coppell. If you should have any questions, please do not hesitate to call. Sincerely, H. Wayne Ginn, P.E. KP/HWG/sr 16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611