Loading...
ST8401-CS 880127 NATHAN D. MAIER CONSULTING ENGINEERS, INC. January 27, 1988 Mr. Steve Morton City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 Re: Construction Costs and Riverchase Drive NDM Job No.: 87-]_2-151 Dear Steve: As you requested, here are the above referenced costs: MacArthur Boulevard: Paving $ Drainage Sanitary Sewer Water City Refund for Oversized Water 595,549 125,049 126,853 252,430 (92,431) Total $1,007,450 Riverchase Drive: Paving $253,467 Drainage 74,326 Sanitary Sewer 108,936 Water 116,427 Total $553,156 I have asked Bobby Harrell at Terra to send you a copy of the City- Developer agreement for the Belt Line/MacArthur intersection, which calls for the inspection on that project to be at city expense. Sincerely, MD/ld NATHAN D. MAIER CONSUI~TI~-.ENGINEE~S, ~-NC. Mike Daniel cc: Mr. Bobby Harrell Three NorthPark/8800 N. Central Expwy./Suite 300/Dallas, Texas 75231/(214) 739-4741