Loading...
ST8502-CS 851211I~PE LINE COiVI~ 1909 Southwood Drive Lake Charles, LA 70605 {318) 491-5855 RECEIVED CCC 1 7 19S5 December 11, 1985 Mr. H. Wayne Ginn Ginn, Inc. 16135 Preston Road, Suite 106 Dallas, TX 75248 Dear Mr. Ginn: I am writing in response to your correspondence with Rick Bird, dated July 29, a copy of which is attached. Continental Pipe Line Company requires that heavy wall concrete coated pipe be installed under highway and railroad crossings in accordance with ANSI B31.4, Liquid Petroleum Transportation Piping Systems, and APl RP 1102, Recommended Practices for Liquid Petroleum Pipelines Crossing Railroads and Highways. The Moore road street improvements project 'is subject to these regulations under the definition of a highway subject to public thoroughfare by self-propelled vehicular traffic. Because of the external stresses .induced on the pipeline from the highway loading, the maximum allowable internal operating pressure must be reduced in accordance with ANSI B31.4, para. 402.3.2(e), 434.13.4(c) and AP! RP 1102, section 4.0. Therefore, the heavy wall concrete coated pipe is utilized to withstand the external stresses and maintain the internal design pressure of the pipeline. The internal design pressure is critical to maintain hydraulic capacity of the system. Furthermore, the proposed installation of 18-inch RCP culvert under Moore road places the Continental Pipe Line Company 6-inch pipeline in danger of being struck during construction. Since the CPL 6-inch is a high pressure petroleum pipeline, it is imperative that proper precaution be taken to insure the safety of the public. Concrete coating will serve to protect the high pressure line from potential rupture during construction of the culvert. Continental Pipe Line is prepared to modify the pipeline system to accom- modate the construction schedule of the Moore road improvements. Prior to initiation of installing the concrete coated pipe, Continental Pipe Line will require that $10,000 be deposited by the city of Coppell in an escrow account to cover costs associated with the pipeline modifications. Please indicate your concurrence with the terms of this letter by signing in the space provided below and returning it to my attention along with a construction schedule indicating the desired date for the pipeline modifications to be completed. ShOuld you have any questions, please call me at (318) 491-5852. Sincerely, David A. Vande~pool District Engineer 47/006:1w Attachment cc K. Peiffer T. E. Souls D. F. Holoubek J. B. Anderson H. Salzhandler H. Wayne Ginn