ST8502-CS 851031GINN, INC. CONSULTING ENGINEERS October 31, 1985 Ashlar Contracting P.O. Box 713 Lewisville, TX 75067 Attn: Mr. George Miller Re: Notice of Award Moore Road Improvements Dear Mr. Miller: The Coppell City Council on October 29, 1985, awarded the contract for the Moore Road Improvements Project to Ashlar Contracting Company. The contract awarded was for a total bid price of $1,938,351.95, which reflects their decision to construct the base bridge vs. the alternate. The City Council did indicate, however, that they would convert to the alternate bridge design if the bridge railing on the base bridge could be utilized on the alternate at a reasonable cost. A change order will be needed for the bridge railing revisions on the alternate bridge and to adjust the total contract price. Contract time is 300 calendar days with liquidated damages of $750.00 per calendar day. Enclosed herewith are six (6) sets of contract documents to be executed by you and returned to 'our office by no later than December 2, 1985 (see Contract Specifications Section 00100, Page 10). Also enclosed are two term agreements with Explorer Pipeline Company which need to be reviewed and executed by your firm and are to be included as a part of these Contract Documents and Specifications (see Specifications Section 00650, paragraph 1.19, page 10). Per the Contract Specifications, there are 100% Performance and Payment Bonds required along with a Certificate of Insurance with limits of coverage as stated therein. Also, all principal subcontractors must be indicated on the bid 5orms (yellow). 16!3'5 Pre,ton Road · 5'~:::c it~e, · Da!ia-. 'lcxa', 7~,24h · Phone 2t4 3Sh-6611 Upon execution of the Contract Documents by both parties, two (2) copies will be returned to you for your records along with your bid bond. If you should have any questions, please do not hesitate to call. Sincerely, Kevin Peiffer Project Engineer /sr Enclosures cc- Frank Proctor Steve Goram Dorothy Timmons