Loading...
ST8401-CS 870924 MAC ARTHUR BLVD. g-q2..-87 All Fire Hydrants need street markders (paint & oil). Fire Hydrant under power line on the East side needs to be raised. 1st Fire Hydrant North of Belt Line needs the top valve changed out. 4 Fire Hydrants South of Belt Line has 4" steamers and needs 4~". No cut-off valve is on the East side and both on West side. 2nd on West side needs to be raised. MacArthur Boulevard ( S ignage ) Speed Limit Signs 24" x 30" - 6 signs Faces - $10.14 ea x 6 = $60.84 Blanks - $12.11 ea x 6 = $72.66 Series E. 10" #s 12 needed $1.45 ea x 12 = $17.40 Labor Building $8.00 hr x 2.5 hrs. = $20.00 Telespar Poles - 6 needed 2" x 2" x 12' $23.16 ea x 8 = $185.28 5/16 x 2% x 18 5/16 washers (flat) 5/16 Hex Nuts 16 bolts x $.13 ea = $2.08 32 washers x .03 ea = $.96 16 nuts x .03 ea = $.48 Sakrete 5 bags $1.99 ea x 7 = $13.93 Travel Time Mileage $.23 mile x 6 miles = $1.38 Little Beaver Equipment Usuage Time 15 minutes per installation x 6 Gas, Oil, Etc .... $3.00 Labor Installing 1 man @ $8.00 per hr. x 6.5 hours = $52.00 Turn Prohibition Sign Faces - Blanks - 24 x 24 1 needed 24 x 24 1 needed $8.39 ea x 2 = $16.78 $9.66 ea x 2 = $19.32 Signagn - Labor - Poles - Hardware/Poles - Sakrete - Travel, Mileage, Equipment - sub total sub total sub total sub total sub total sub total $187.00 $72.00 $185.28 $3.52 $13.93 $4.38 $466.11 coeP~c.L.. NoD ~ o~ o~