ST8401-CS 870924
MAC ARTHUR BLVD.
g-q2..-87
All Fire Hydrants need street markders (paint & oil).
Fire Hydrant under power line on the East side needs to be raised.
1st Fire Hydrant North of Belt Line needs the top valve changed out.
4 Fire Hydrants South of Belt Line has 4" steamers and needs 4~". No cut-off valve
is on the East side and both on West side. 2nd on West side needs to be raised.
MacArthur Boulevard
( S ignage )
Speed Limit Signs
24" x 30"
- 6 signs
Faces - $10.14 ea x 6 = $60.84
Blanks - $12.11 ea x 6 = $72.66
Series E. 10" #s 12 needed
$1.45 ea x 12 = $17.40
Labor Building
$8.00 hr x 2.5 hrs. = $20.00
Telespar Poles - 6 needed
2" x 2" x 12' $23.16 ea x 8 = $185.28
5/16 x 2% x 18
5/16 washers (flat)
5/16 Hex Nuts
16 bolts x $.13 ea = $2.08
32 washers x .03 ea = $.96
16 nuts x .03 ea = $.48
Sakrete 5 bags
$1.99 ea x 7 = $13.93
Travel Time
Mileage $.23 mile x 6 miles = $1.38
Little Beaver
Equipment Usuage Time
15 minutes per installation x 6
Gas, Oil, Etc .... $3.00
Labor Installing
1 man @ $8.00 per hr. x 6.5 hours = $52.00
Turn Prohibition Sign
Faces -
Blanks -
24 x 24 1 needed
24 x 24 1 needed
$8.39 ea x 2 = $16.78
$9.66 ea x 2 = $19.32
Signagn -
Labor -
Poles -
Hardware/Poles -
Sakrete -
Travel, Mileage, Equipment -
sub total
sub total
sub total
sub total
sub total
sub total
$187.00
$72.00
$185.28
$3.52
$13.93
$4.38
$466.11
coeP~c.L..
NoD ~ o~ o~