Loading...
ST8401-CS 870728 GINN, INC. July 28, 1987 CONSULTING ENGINEERS Mr. Anselmo ~ntemayor Nathan D. M~er Consulting Engineers 8800 N. C~tral Expressway, Suite 300 Dallas ,/exas 75231 Re. R6ad Improvements - Belt Line Road at MacArthur Boulevard - Signals & Signage Dear Mr. Montemayor: A review of the latest revision for the "Road Improvements - Belt Line Road at MacArthur Blvd." by our Traffic Engineer has produced the need for a number of corrections. The needed corrections are marked in red on the attached plan sheet. Corrections needed are as follows: The 4" solid edge line stripes on Belt Line Road both east and west of MacArthur must be white in color in order to conform with MUTCD requirements. The directional arrow lane designation signs on Belt Line Road both east and west of MacArthur should be located with reference to the median nose on Belt Line at MacArthur Blvd. The distance is 420 feet. 3 e The "Left Lane Must Turn Left" sign in the median of MacArthur south of Belt Line Road should be located 300 feet south of the gore of the painted median on MacArthur south of Belt Line Road. Since the painted median on MacArthur Blvd. south of Belt Line Rd. divides traffic moving in the same direction, the paint and buttons must be white in color to conform to the MUTCD requirements. 0 Standard railroad crossing pavement markings must be installed on MacArthur Blvd. both north and south of the railroad tracks. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 Mr. Anselmo Montemayor July 28, 1987 Page 2 Please revise your plans in accordance with the markings and comments and resubmit them for review at your convenience. Sincerely, John C. Karlsruher, P.E. /jc cc- Alan D. Ratliff Wayne Ginn Gabe Favre Steve Morto~ JK701/280