Loading...
ST8401-CS 861024GINN, INC. CONSULTING ENGINEERS UTILITY LINE INSPECTION AND TESTING Date: ./OP- 2~-~ Area: Line: Diameter: ~" ~ Length: ~ ~ Plan Sheet No: PRESSURE TEST START F I N I SH Time: -----~o~ ~,/~f. Time: /~'~o~.~f. Pressure: ./.5'~' ,~. ~..~. Pressure: /d-~ ,e/.~. Z_ Allowable Leakage Per Day.:. (Il.kS gpd) X G~Z miles of pipe) X (~26/ inch Diameter) = Gallons Lost Per Day: (,' Z/ Gal. Lost) ? ( 2 Hrs. Tested) X 24 Hrs. Passed: INF I LTRAT ION/EXF I LTRAT ION TEST START FINISH Time: Time: Allowable Leakage Per Day: (250 gpd)- X ( miles of pipe) X ( inch Diameter) Gallons Lost Per Day: ( Gal. Lost) ? ( Passed: COMMENTS: Hrs. Tested) X 24 Hrs. = Rejected 13T$0 Midway Road ·