Report
Conference
XX Field Observation
Telephone Conversation
Project Name:
Location:
Date:
Participants:
Riverchase
MacArthur Boulevard Landscape Development
JJR #14300-110-61
Coppell, Texas
g October 1986
Randy Fleming - Coppell City Inspector
Mike Daniel - Riverchase Joint Venture
Tom Dixon - Nathan D. Maier Engineers
Bill Bullinger - O'Brien Contracting
Tom Kaiser - O'Brien Contracting
Paul Wiese - JjR
Items discussed:
The following items were discussed and observed:
1. Paul Wiese to contact DP&L about the condition of the berms and
electric line trench in the median.
2. O'6rien to backfill behind walks to prevent subgrade from washing
away.
3. Randy Fleming approved reducing the width of the concrete walk at the
fire hydrant where a tree was planted too close to the hydrant. The
walk should be poured symmetrical about the hydrant.
4. Randy Fleming to contact storm sewer contractor to get the manhole in
the walk raised to the proper grade.
5. Randy Fleming to contact the paving contractor to get the gaps at the
back of the curb sealed.
F~eld Observation
Riverchase
J~R #14300-110-61
9 October 1986
Page 2
6. O'Brien to seal gaps at back of inlets.
7. O'Brien to replace section of walk where manhole has shifted.
8. At the handicap ran~s, O'Brien to pour restraining edge at back of
ramp per attached detail. Remove temporary concrete restraining edge
at front of ramp and provide double row of grey pavers.
This represents our understanding of the items discussed
Notify JJR of any comments or discrepancies.
Respectfully submitted,
JOHNSON, JOHNSON & ROY/inc.
Paul J. Wiese
and observed.
PJW/bl
cc: Randy Fleming - Ginn Inc.
Jay Patterson - Riverchase Joint Venture
Mike Daniel - Riverchase Joint Venture
Janet Vick - Nathan D. Maier Engineers
Bill Bullinger - O'Brien Landscape Contracting