Loading...
ST8401-CS 860922GINN, INC. September 22, 1986 CONSULTING ENGINEERS Mr. Monroe Clark Texas Bitulithic Co. P.O. Box 10365 Dallas, TX 75207 Re: Riverchase -- MacArthur Boulevard Paving -- Phase I Dear Mr. Clark: Final acceptance to the above referenced project cannot be recognized at this time. Utilities, sidewalks, conduits and other miscellaneous items pertaining to the project must be addressed, along with one-year maintenance bonds and as-built drawings. ~owever, recognition of substantially complete has been confirmed with your firm on September 18, 1986. Other contractors to the project still have outstanding items of work to be completed, prior to the final acceptance walk-through, in which Ginn, Inc. and the City of Coppell have no control. If I can be of further assistance, please do not hesitate to call. Randy Fleming cc: Janet Vick Tom Dixon Rueben Martinez 16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214/386-6611