Loading...
2001_0308 Wec CMnge Coat WATER Issued: 31 V 1O 1 Finished: Employee: Clair Grid map: Name: Address: `,Q I?) > (A 1 n9inn Phone Number: (HM) (WK): Check for. Accuracy test Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. Backflow Insp, 2. Repair 3. Maintenance 4. Other Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cep. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other • Request for Services: r 7. If MeteriService Leak Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons -_ B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Change Out: Unit # Miles Hrs Equipment A. Old Meter # q 339 O &* Reading a IP B. New Meter # 2 t,4.�45 OCR Reading &�_1, C. Old Meter Size/Type: D New Meter Size/Type E. Type of work performed or findings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man- hours: Crew Members. 11. List Materials Used: 12. If you had an accidencIncident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many trips to do task?