Loading...
ST8501-CS 880208~PPELL PUBLIC WORKS MEMORANDUM February 8, 1988 ~q TO: Steve Goram, Director of Public Works FROM: Steven M. Morton, Development Inspector RE: Punch List- Freeport Parkway Richard Diano, Per Birdsall, Carl Bass, Randy Fleming and myself met and walked Freeport Parkway and these are the deficient items Brick pavers N. E. corner of entry- focal point broken Brick pavers in north median- nose (Gateway/ Freeport) dropped Brick pavers in street crossings have settled at concrete edges. Broken curb at south bound lane (west) at contruction joint tie-in. (project start) Place additional topsoil in medians (to the top of curb) Pull boxes not installed (item 12) Blow Rat thru PVC and install pull strings Replace broken inlets covers & missing covers Broken variable curb @ Cowboy Drive Patch chipped curb (south bound lane west outside) Broken conduit at south crossover- north side of median Clean storm sewer system Install irrigation system Add conduits for signalization Sanitary sewer shows signs of infilteration- will need to T.V. and repair Install landscaping Construct monument Submit contract amounts for construction fee assessment of 1.5% Inspection Fee. SMM / sm