ST8501-CS 880510COPPELL PUBLIC NORKS
MEMORANDUM
May 10, 1988
TO:
FROM:
RE:
Steve Goram, Director of Public Works
Per Birdsall, Street Foreman ~j~
Specification 'for Aluminum Bridge Railing
Attached are details of the bridge railing that existed on
Freeport Parkway near Gateway. These details and statement
of the length required should be sufficient for bidding purposes.
I recommend, however, that in the request for bid, labor and
materials should be separate to obtain the best price. The
request for bid should also stipulate that the bidder will be
responsible for verifying lenghts and quantities to assure job
completion. Attached is the list of known suppliers of bridge
materials and bridge contractors.
If you have any questions, please advise.
PHB/sm
BRIDGE RAILING CONTRACTORS
SWH Construction - Wylie Fountain
Brown Blackney- J~m Bass
J&M Construction. Gene Jackson
Ashlor - Dan Mill or Red Wolfe
Rogers & Clyde - Randy Rogers
430-3563
(817) 244-6024
231-0452
436-5509
553-9999
SUPPLIER-ALUMINUM RAILING
Gordon Specialties - Gordon (Rocky) Tovey
Double Rail Aluminum Bridge Railing:
These specifications are for bridge railing on Freeport Parkway
between Cotton Road and Gateway Boulevard.
Length - 584 linear feet
Details and other specifications are on attachments 1 thru 5.
Note:
The majority of the anchor bolts are still intact, 32 missing,
1 broken.
-- There are 3 aluminum posts missing
There is 150' of the top rail remaining
There is none of the bottom rail remaining
Additional mounting hardware is missing