Loading...
ST8501-CS 880510COPPELL PUBLIC NORKS MEMORANDUM May 10, 1988 TO: FROM: RE: Steve Goram, Director of Public Works Per Birdsall, Street Foreman ~j~ Specification 'for Aluminum Bridge Railing Attached are details of the bridge railing that existed on Freeport Parkway near Gateway. These details and statement of the length required should be sufficient for bidding purposes. I recommend, however, that in the request for bid, labor and materials should be separate to obtain the best price. The request for bid should also stipulate that the bidder will be responsible for verifying lenghts and quantities to assure job completion. Attached is the list of known suppliers of bridge materials and bridge contractors. If you have any questions, please advise. PHB/sm BRIDGE RAILING CONTRACTORS SWH Construction - Wylie Fountain Brown Blackney- J~m Bass J&M Construction. Gene Jackson Ashlor - Dan Mill or Red Wolfe Rogers & Clyde - Randy Rogers 430-3563 (817) 244-6024 231-0452 436-5509 553-9999 SUPPLIER-ALUMINUM RAILING Gordon Specialties - Gordon (Rocky) Tovey Double Rail Aluminum Bridge Railing: These specifications are for bridge railing on Freeport Parkway between Cotton Road and Gateway Boulevard. Length - 584 linear feet Details and other specifications are on attachments 1 thru 5. Note: The majority of the anchor bolts are still intact, 32 missing, 1 broken. -- There are 3 aluminum posts missing There is 150' of the top rail remaining There is none of the bottom rail remaining Additional mounting hardware is missing