Loading...
ST8501-CS 871013The City With A ' October 13, 1987 P.O. Box 478 Coppell, Texas 75019 214-462-0022 Mr. Phillip J. Smith Bagwe11 Realty Co. 302 N. Market Street, suite 200 Dallas, TX 75202 Re: Freeport Parkway from 1-635 to Gateway Blvd., Coppell Dear Mr. Smith: The improvements included in the above referenced project were never accepted by the City of Coppell. As such, the process we envision being required for completion of the project is as follows: ® Submit documentation attesting that all liens against the facilities included in the project have been satisfied. Contact the City of Coppell Public Works Department to schedule a "walk through" inspection for the purpose of identifying any deficiencies in the facilities which must be brought up to the applicable City standards in effect at the time of Final Plat acceptance, prior to acceptance by the City of Coppell. Perform the work required to bring the facilities to an acceptable level of compliance with the above mentioned City standards. Request a Final Inspection upon completion of #3. Furnish a bond in the amount of 10% of the Contract amount for the original construction guaranteeing workmanship and materials for a period of one year from the date of acceptance by the City. Furnish documentation that attests to the existence of a property owners association which is responsible for maintenance of the items covered by the Streetscape Plan. Furnish and install street lighting in accordance with the following= Street lighting shall conform to the latest edition of the Illuminating Engineering society Handbook. B. Lighting levels shall be as recommended for: 1. Very light traffic in residential areas. 2. Medium traffic on feeder streets. 3. Heavy traffic on thoroughfares. Street lights shall be as manufactured by Klm Standards. Dg The initial cost of installation, operation, and maintenance for the first three years shall be paid by the Developer to the City. Maintenance and operation after this period shall be provided by the City. One additional item of concern to the City of Coppe11 is the channel improvements which were previously made to Grapevine Creek. The channelization/reclamation of floodplain has never been approved by the Federal Emergency Management Agency. Recently, the Southwestern Town Lot Corporation has received conditional approval for their proposed reclamation which may include improvements on the subject property. We ask that you contact Mr. T. N. Searcy of Southwestern Town Lot Corporation concerning those improvements. We appreciate your interest in working with the City of Coppell in resolving these issues. // Sincerely, --~ ........ -----, /./~~' Alan D. Ratliff, City F~%~ger cc: H. Wayne Ginn, P.E. Kevin Peiffer Shohre Daneshmand Steve Goram John C. Karlsruher, P.E. File 280-034 GINN, INC. CONSULTING ENGINEERS October 13, 1987 Mr. Lynn Kadleck Kadleck & Associates P.O. Box 11-1033 Carrollton, TX 75011-1033 Re: Freeport Parkway from 1-635 to Gateway Blvd., Coppell Dear Mr. Kadleck: Pursuant to your request for information concerning the above mentioned project we have researched the files and found that the facilities constructed in association with the above have not received acceptance by the City of Coppell. At the time that work ceased on the project a final walk through inspection had been conducted with City personnel and a final "punch list" was developed. To the best of our knowledge, the punch list items, including the furnishing of one year maintenance bonds, were never completed. In order for the project to be accepted by the City of Coppell, the following items must be complied with: ® Submit documentation attesting that all liens against the facilities included in the project have been satisfied. Contact the City of Coppell Public Works Department to schedule a "walk through" inspection for the purpose of identifying any deficiencies in the facilities which must be brought up to the applicable City standards in effect at the time of Final Plat acceptance, prior to acceptance by the City of Coppell. Perform the work required to bring the facilities to an acceptable level of compliance with the above mentioned City standards. Request a Final Inspection upon completion of #3. Furnish a bond in the amount of 10% of the Contract amount for the original construction guaranteeing workmanship and materials for a period of one year from the date of acceptance by the City. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 Furnish documentation that attests to the existence of a property owners association which is responsible for maintenance of the items covered by the Streetscape Plan. Furnish and install street lighting in accordance with the following: A. Street lighting shall conform to the latest edition of the Illuminating Engineering Society Handbook. B. Lighting levels shall be as recommended for: 1. Very light traffic in residential areas. 2. Medium traffic on feeder streets. 3. Heavy traffic on thoroughfares. Street lights shall be as manufactured by Kim Standards. Se The initial cost of installation, operation, and maintenance for the first three years shall be paid by the Developer to the City. Maintenance and operation after this period shall be provided by the City. The owner of the property involved with the above mentioned project must work with Southwestern Town Lot Corporation to remedy F.E.M.A.'s concerns on Grapevine Creek, due to the existing improperly designed channel modifications. If you have any further questions, please call. Sincerely, John C. Karlsruher, P.E. Ginn, Inc. JCK/dsp cc: H. Wayne Ginn, P.E. Kevin Peiffer Shohre Daneshmand, City civil Engineer Steve Goram, Director of P~bliu~~ File 280-034