WA9601-CS 990621 (3) AN
F/I~ 1665 Harmon Road
,1~/~ Fort Worth, Texas
I U.S.A. 76177
June 21, 1999 1 d ~ Tel: (817) 439-8888
C01? ,~ Fax: (8~ 7) 439-9~
Oop~ll, Texas 7501g ~ /
Re: Wa~n ~eel R
Dear Mr. Da~s: .'
We opt to use Ohlo~na~on Me~od No. 3. ~i~ en~ils for ~e water and ~lo~ne to
be add~ to ~e storage facili~ in amounts such that the ~lution will initiall~ ~nmin 50
MG/L a~ilable ~lo~ne and will fill 8ppm~matel~ 5 ~r~nt of ~e total storage ~lume.
This solu~on shall be held in ~e s~mge fa~li~ for a pe~ ~ not less ~8t G houm.
The storage facili~ shall ~en ~ fill~ to ~G o~ow level b~ fio~ng ~blG water i~o
~e higher ~lo~nated Water It shall be held for a ~od ~ not I~s ~at 24 h~m. All
highl~ ~lo~nated water shall ~en ~ purg~ ~mugh ~G drain piping.
Following this procure, and subje~ to sa~sfa~o~ ba~G~ologi~l testing and
a~p~ble aes~etic q~li~, ~e remaining ~ter ma~ be deli~md to ~e dis~bu~on
s~stem. We ~11 dose ~e tank from the 8' lateral line at ~e ~int ~em we ti~ onto
e~ng 12' waredine. ~emfom ~lo~n~on of all pipi~ on ~e proje~ alo~ ~ ~e
chlo~na~on of ~e tank.
Very truly yours,
LANDMARK STRUCTURES, INC.
Jason Davis ~ost-it®Fax Note 7671 ~
Project Manager ~ 'to., Diets
/cm ~
Design Innovation. Construction Excellence