ST8402-CS 890920GINN, INC. CONSULTING ENGINEERS Date: To: From: MEMORANDUM September~2~989 Russell/oyle, P.E. John C. Karlsruher, P.E. Subject: Weekly Progress Report for Denton Tap Road Projects Monday, 9/11/S9. Rain 73'-83' Contractor not working (North and South) Tuesday, 9/12/S9 Cloudy 70'-85' Contractor not working (North and South) Wednesday, 9/13/S9 Rain 75'-60' Contractor not working (North and South) Thursday, 9/14/89 Clear, Sunny Pumping water from behind curbs and low areas in grade. 1 foreman, 2 laborers; AM drizzle (North and South) 56'-68' PM Traffic button layout in progress on North project (Lectric Safety Lites) Friday, 9/15/89 Clear, Sunny 540-85° PM (South project) Backfilling east outside back of curb from Coppell Hardware Store to Meadow Creek. Hauling off concrete rubble, building materials and trash from east 34' width roadway (Northbound lanes). 1 foreman, 4-5 laborers. (North project) No work. Saturday, 9/16/89 Clear, Sunny 70'-88' PM (North project) No work (South project) Topsoil being placed in median islands from Grapevine Creek bridge to Dairy Queen. Backfilling East outside back of curb from RR tracks to Mobil Gas Station. Note: dump trucks cut overhead telephone cable to Joe Bob Fikes's business, approx. 9:30 AM. Did not call GTE; personnel at Northlake Nursery called GTE in afternoon, Contractor negligence. Install lime dirt in Bethel School Road East 2-30' radii. 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 Clear, Sunny 60°-90° PM (North project) L.H. Lacy - 1 foreman, 3 laborers; Box Blade Cleaning east outside slope from Cottonwood Creek Bridge to Denton Creek Sta. 206+35 (end contract) Lectric Safety Lites - 3 men (sub-contractor), installing 4" white skip-lane buttons from rt. and sta. 171+24 to 197+00 (north bound lane). Installed left turn lane buttons north bound lanes; * all wrong locations (rejected). (South project) Topsoil being placed in median islands, shaping median islands L.H. Lacy - 2nd crew 1 foreman, 4 laborers Jim Bowman Construction - 1 foreman, 4 men - re-tieing rail steel on Grapevine Creek Bridge - East side Note: 2nd clean-up crew arrived today - 1 foreman, 3 men Clear, Sunny 58°-85° PM (North project) Lectric Safety Lites - Marvin, 1 laborer (11:30-12:15) Layout on 8" yellow buttons in HMAC transition 203+00 to 206+00 (9:00-11:30) trying to remove left turn lane buttons. Destroying concrete surface. Departed at 12:30 PM Tommy Estes Company - Subcontractor; 2 men; 9:00-12:00 - Layout on 4" white stripe north of Parkway Blvd. - Denton Tap Road. Surface not properly prepared. Dirt, grease, sealant on surface of concrete. Can't install stripe until 8" yellow buttons installed. Departed project at 12:10 PM. Mobilize on project late tomorrow afternoon. L.H. Lacy - 1 foreman, 3 men - Clean up at Parkway Blvd. - Denton Tap Road intersection Eagle Const. Co. - 1 foreman, 5 men - mobilized on project today. (North project) Poured fillets and left turn lane section around small median nose sta. 170+64 (South project) Poured and formed N.E. wheelchair ramp at Braewood. Poured block-outs around water valves within pavement sections. ! CITY OF COPPEL] DALLY INSPECTION K ENGINEERING DEPT. DATE WORK STARTED: WORK DA~ ~--__ o ,°°I CLEAR 20° 30° PC WEATHER 60°--~'~0° ] 80° SNOW ICE I 90o 100° WIND ] DEW SPEED POINT BARRICEDE TRENCH OTHER WORK DAY PLACEMENTj~ SAFETY ~ ~-'5~E~[- NO YES NO YES NO ACTIVITY INSPECTOR: CONTRACTOR.- DATE WORK STARTED: CITY OF COPPELL DAILY INSPECTION REPORT ENGINEERING DEPT. l FOREMAN: WORKDAY CHARGED: WEATHER 0° 10° 20° 30° CLEAR 40° 50° CLD RAIN 60°.~0° 80° 90° 100° WIND [ DEW SPEED POINT BARRICEDE TRENCH OTHER ~dORK DAY PLACEMENT SAFETY NO YES NO YES NO ACTIVITY INSPECTOR: CITY OF COPPELL DAILY INSPECTION REPORT ENGINEERING DEPT. DATE WORK STARTED: FOREMAN: WORK DAY CHARGED: WEATHER o 10o [ 20o CLEAR 30o ] 40° P._~_C { CLD 50° RAIN 60°_~70° 80° [ 90° -lily: ICE WIND 100° DEW POINT BARRICEDE TRENCH OTHER WORK DAY PLACF2W. ENT SAFETY NO YES NO YES NO ACTIVITY iNSPECTOR:~~,~-~ CITY OF COPPELL DAILY INSPECTION REPORT ENGINEERING DEPT. CONTRACTOR: 2, H, DATE WORK STARTED: FOREMAN: WORK DAY CHARGED: WEATHER 0 CLEAR P_.q ] 40° CLD 50° RAIN SNOW ICE 80° 90 WIND SPEED 100° DEW POINT BARRICEDE TRENCH OTHER WORK DAY PLACEMENT SAFETY L~'~-] No ','ES ~0 ~ NO ACTIVITY _~.~_,.:~,/L &,,:~_:P Z,., ~_,, ,. ~" ~-~ .'/:'7" -~' -/"~"'~""~---' INSPECTOR CITY OF COPPELL DALLY INSPECTION REPORT ENGINEERING DEPT. FOREMAN: DATE WORK STARTED: WORK DAY CflARGED: ~EATHER 0° 10° 20° 30o CLEA~ PC 40° 50° CLD RAIN 60° SNOW 70°~80° ICE 90' WIND SPEED 100o DEW POINT BARRICEDE TRENCH OTHER WORK DAY PLAC F.,I~NT SAFETY / t__-yES NO YES NO YES NO ACTIVITY INSPECTOR:~ CITY OF COPPELL DALLY INSPECTION REPORT PROJECT: ~//' FI / O CO.T CTOR DATE WORK STARTED: ENGINEERING DEPT. FOREMAN: WORK DAY CHARGED: 0° I 10° WEATHER CLEAR I 200 30° 40° ! 50° CLD RAIN 60°~0° SNOW ICE 80o [ 90o WIND SPEED 100o BARRICEDE TRENCH OTHER WORK DAY PLACF2~ENT SAFETY NO YES NO YES NO DEW POINT ACTIVITY INSPECTOR TO: SUBJECT: TI,,~ CI1.Y WI1.H A BF. Au1.1KUL Ir UI'uR[ HANDWR I TTEN MEMORANDUM ~t m~ ~,4T~)i='F-