MEMORANDUM
September~2~989
Russell/oyle, P.E.
John C. Karlsruher, P.E.
Subject: Weekly Progress Report for Denton Tap Road Projects
Monday, 9/11/S9.
Rain 73'-83' Contractor not working (North and South)
Tuesday, 9/12/S9
Cloudy 70'-85' Contractor not working (North and South)
Wednesday, 9/13/S9
Rain 75'-60' Contractor not working (North and South)
Thursday, 9/14/89
Clear, Sunny Pumping water from behind curbs and low areas in
grade. 1 foreman, 2 laborers; AM drizzle (North and South)
56'-68' PM Traffic button layout in progress on North project
(Lectric Safety Lites)
Friday, 9/15/89
Clear, Sunny 540-85° PM (South project) Backfilling east outside
back of curb from Coppell Hardware Store to Meadow Creek.
Hauling off concrete rubble, building materials and trash from
east 34' width roadway (Northbound lanes). 1 foreman, 4-5
laborers.
(North project) No work.
Saturday, 9/16/89
Clear, Sunny 70'-88' PM (North project) No work
(South project) Topsoil being placed in median islands from
Grapevine Creek bridge to Dairy Queen. Backfilling East outside
back of curb from RR tracks to Mobil Gas Station. Note: dump
trucks cut overhead telephone cable to Joe Bob Fikes's business,
approx. 9:30 AM. Did not call GTE; personnel at Northlake
Nursery called GTE in afternoon, Contractor negligence. Install
lime dirt in Bethel School Road East 2-30' radii.
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900
Clear, Sunny 60°-90° PM (North project) L.H. Lacy - 1 foreman,
3 laborers; Box Blade
Cleaning east outside slope from Cottonwood Creek Bridge to
Denton Creek Sta. 206+35 (end contract)
Lectric Safety Lites - 3 men (sub-contractor), installing 4"
white skip-lane buttons from rt. and sta. 171+24 to 197+00 (north
bound lane). Installed left turn lane buttons north bound lanes;
* all wrong locations (rejected).
(South project) Topsoil being placed in median islands, shaping
median islands
L.H. Lacy - 2nd crew 1 foreman, 4 laborers
Jim Bowman Construction - 1 foreman, 4 men - re-tieing rail steel
on Grapevine Creek Bridge - East side
Note: 2nd clean-up crew arrived today - 1 foreman, 3 men
Clear, Sunny 58°-85° PM (North project) Lectric Safety Lites -
Marvin, 1 laborer
(11:30-12:15) Layout on 8" yellow buttons in HMAC transition
203+00 to 206+00
(9:00-11:30) trying to remove left turn lane buttons. Destroying
concrete surface. Departed at 12:30 PM
Tommy Estes Company - Subcontractor; 2 men; 9:00-12:00 - Layout
on 4" white stripe north of Parkway Blvd. - Denton Tap Road.
Surface not properly prepared. Dirt, grease, sealant on surface
of concrete. Can't install stripe until 8" yellow buttons
installed. Departed project at 12:10 PM. Mobilize on project
late tomorrow afternoon.
L.H. Lacy - 1 foreman, 3 men - Clean up at Parkway Blvd. - Denton
Tap Road intersection
Eagle Const. Co. - 1 foreman, 5 men - mobilized on project today.
(North project) Poured fillets and left turn lane section around
small median nose sta. 170+64
(South project) Poured and formed N.E. wheelchair ramp at
Braewood. Poured block-outs around water valves within pavement
sections.
!
CITY OF COPPEL]
DALLY INSPECTION K
ENGINEERING
DEPT.
DATE WORK STARTED:
WORK DA~ ~--__
o
,°°I
CLEAR
20° 30°
PC
WEATHER
60°--~'~0° ] 80°
SNOW ICE
I
90o 100°
WIND ] DEW
SPEED POINT
BARRICEDE TRENCH OTHER WORK DAY
PLACEMENTj~ SAFETY ~
~-'5~E~[- NO YES NO YES NO
ACTIVITY
INSPECTOR:
CONTRACTOR.-
DATE WORK STARTED:
CITY OF COPPELL
DAILY INSPECTION REPORT
ENGINEERING
DEPT.
l
FOREMAN:
WORKDAY CHARGED:
WEATHER
0°
10°
20°
30°
CLEAR
40° 50°
CLD RAIN
60°.~0°
80° 90°
100°
WIND [ DEW
SPEED POINT
BARRICEDE TRENCH OTHER ~dORK DAY
PLACEMENT SAFETY
NO YES NO YES NO
ACTIVITY
INSPECTOR:
CITY OF COPPELL
DAILY INSPECTION REPORT
ENGINEERING
DEPT.
DATE WORK STARTED:
FOREMAN:
WORK DAY CHARGED:
WEATHER
o
10o [ 20o
CLEAR
30o ] 40°
P._~_C { CLD
50°
RAIN
60°_~70° 80° [ 90°
-lily:
ICE WIND
100°
DEW
POINT
BARRICEDE TRENCH OTHER WORK DAY
PLACF2W. ENT SAFETY
NO YES NO YES NO
ACTIVITY
iNSPECTOR:~~,~-~
CITY OF COPPELL
DAILY INSPECTION REPORT
ENGINEERING
DEPT.
CONTRACTOR: 2, H,
DATE WORK STARTED:
FOREMAN:
WORK DAY CHARGED:
WEATHER
0
CLEAR P_.q ]
40°
CLD
50°
RAIN
SNOW ICE
80°
90
WIND
SPEED
100°
DEW
POINT
BARRICEDE TRENCH OTHER WORK DAY
PLACEMENT SAFETY
L~'~-] No ','ES ~0 ~ NO
ACTIVITY
_~.~_,.:~,/L &,,:~_:P Z,., ~_,, ,. ~" ~-~ .'/:'7" -~' -/"~"'~""~---'
INSPECTOR
CITY OF COPPELL
DALLY INSPECTION REPORT
ENGINEERING
DEPT.
FOREMAN:
DATE WORK STARTED:
WORK DAY CflARGED:
~EATHER
0°
10° 20° 30o
CLEA~
PC
40° 50°
CLD RAIN
60°
SNOW
70°~80°
ICE
90'
WIND
SPEED
100o
DEW
POINT
BARRICEDE TRENCH OTHER WORK DAY
PLAC F.,I~NT SAFETY
/
t__-yES NO YES NO YES NO
ACTIVITY
INSPECTOR:~
CITY OF COPPELL
DALLY INSPECTION REPORT
PROJECT: ~//' FI / O
CO.T CTOR
DATE WORK STARTED:
ENGINEERING
DEPT.
FOREMAN:
WORK DAY CHARGED:
0° I 10°
WEATHER
CLEAR
I 200 30°
40° ! 50°
CLD RAIN
60°~0°
SNOW ICE
80o [ 90o
WIND
SPEED
100o
BARRICEDE TRENCH OTHER WORK DAY
PLACF2~ENT SAFETY
NO YES NO YES NO
DEW
POINT
ACTIVITY
INSPECTOR
TO:
SUBJECT:
TI,,~ CI1.Y WI1.H A
BF. Au1.1KUL Ir UI'uR[
HANDWR I TTEN MEMORANDUM
~t m~ ~,4T~)i='F-